Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹81.9 LAccepted-AOC NO 218 LAKSHMANA RAO STREET PUDHUPETTAI KRISHNAGIRI 635 001 | KRISHNAGIRI | KRISHNAGIRI | TAMIL NADU | 635001 | 1 | Accepted-AOC WORK AWARDED | |
| 2 | 2₹87.4 L+₹5.4 L (6.62%)Rejected-AOC NO 139 CONVENT ROAD ALAGAPURAM SALEM 16 | SALEM | SALEM | TAMIL NADU | 2 | Rejected-AOC Second Lowest | |
| 3 | 3₹93.0 L+₹11.0 L (13.4%)Rejected-AOC | 3 | Rejected-AOC Third Lowest |
Tender Value
₹82.1 L
EMD Value
₹51,100
Closing Date
7 Mar 2024, 3:00 pmClosed
The Special Chief Engineer
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Providing Electrical Arrangements of Parliament Election 2024 for No.11 Tiruvannamalai Constituency at Regulated Agriculture Marketing Commitee at Tiruvannamalai in Tiruvannamalai District.
2024_PWD_431732_1
64/TVM-CLE/23-24/2/ DT.26.02.2024
Open Tender
Electrical Works
Lump-sum
60 days
TIRUVANNAMALAI
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹51,100
29 Apr 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
7 Mar 2024
1 Mar 2024
Amount
Hire and labour charges for supply,fixing and dismantling of 200W LED fitting with suitable cross arm on existing support (one trial day and 1 end days ) (SR)
Hire and labour charges for maintaining of 200W LED fitting from (28 Days)
Hire and labour charges for supply,fixing and dismantling of Pedastal Fan on existing support (one trial day and 1 end days ) (SR)
Hire and labour charges for maintaining of Pedastal Fan from (28 Days)
Hire and labour charges for supply, fixing and dismantling 48" Ceiling fan on the existing clamp or support (one trial day and 1 end days )
Hire and labour charges for maintaining of 48" Ceiling fan from (28 Days)
Hire and labour charges for supply, fixing and dismantling of 4'40W patty tube light on the existing clamp or support (one trial day and 1 end days )
Hire and labour charges for maintaining of 4'40W patty tube light from (28 Days)
Hire and labour charges for supply, fixing and dismantling of 15A / 5A plug sets (one trial day and 1 end days )
Hire and labour charges for maintaining of 5A / 5A plug sets from. (28 Days)
Hire and labour charges for supply, fixing and dismantling of 20A AC plug sets (one trial day and 1 end days )
Hire and labour charges for maintaining of 20A AC plug sets from (28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 150 sqmm LTUG Cable (one trial day and 1 end days )
Hire and labour charges for maintaining of 3 1/2 x 150 sqmm LTUG Cable from (28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 120 sqmm LTUG Cable (one trial day and 1 end days )
Hire and labour charges for maintaining of 3 1/2 x 120 sqmm LTUG Cable from (28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 70 sqmm LTUG Cable (one trial day and 1 end days )
Hire and labour charges for maintaining of 3 1/2 x 70 sqmm LTUG Cable from (28 Days)
Hire and labour charges for supply run off and dismantling of 3 1/2 x 50 sqmm LTUG Cable (one trial day and 1 end days )
Hire and labour charges for maintaining of 3 1/2 x 50 sqmm LTUG Cable from (28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 17/19 sq mm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 4 of 17/19 sq mm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 19/16 sq mm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 4 of 19/16 sq mm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 7/16 sq mm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 4 of 7/16 sq mm wire from 29 Days)
Hire and labour charges for supply run off and dismantling of 4 of 19/18 sq mm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 4 of 19/18 sq mm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 4 of 7/18 sq mm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 4 of 7/18 sq mm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 7/20 wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 2 of 7/20 wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 2.5 sqmm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 2 of 2.5sqmm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 4 sqmm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 2 of 4sqmm wire from (28 Days)
Hire and labour charges for supply run off and dismantling of 2 of 6 sqmm wire (one trial day and 1 end days )
Hire and labour charges for maintaining of 2 of 6 sqmm wire from (28 Days)
Hire and labour charges for supply,fixing and dismantling of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc.,
Hire and labour charges for maintaining of Public address system with necessary - Mic -2Nos, Amplifier - 1No and speaker - 2 Nos etc., on (4 Days)
Hire and labour charges for supply,fixing and dismantling of Earth pipe (one trial day and 1 end days ) (SR)
Hire and labour charges for maintaining of Earth pipe from (28 Days)
Hire and labour charges for supply,fixing and dismantling of 6mtr GI post for Focus light fitting (one trial day and 1 end days) (SR)
Hire and labour charges for maintaining of of 6mtr GI post for Focus light fitting from (28 Days)
Hire and labour charges for supply,fixing and dismantling 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar (one trial day and 1 end days) (SR)
Hire and labour charges for maintaining of 100A Panel Board with 100A TPN Switch & 5 Nos. 30A TPN switch with Bus Bar from (28 Days)
Hire and labour charges for supply,fixing and dismantling 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch(one trial day and 1 end days ) (SR)
Hire and labour charges for maintaining of 250A Panel Board with 250A TPN Switch & 7 Nos. 63A DPMCB switch from (28 Days)
Hire and labour charges for supply,fixing and dismantling 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch (one trial day and 1 end days) (SR)
Hire and labour charges for maintaining of 63A Distribution Board with 63A TPN MCB & 18 Nos. 10-32A SP MCB Switch from (28 Days)
Hire and labour charges for supply,fixing and dismantling of 12 way SP MCB Distribution Board with 32A SPN MCB & 10 Nos. 10-32A SP MCB Switch (one trial day and 1 end days ) (SR)
Hire and labour charges for maintaining of12 way SP MCB Distribution Board with 32A DP MCB & 10 Nos. 10-32A SP MCB Switch from (28 Days)
Hire and labour charges for supply,fixing and dismantling of 200A Meter board with 3 Nos 200A Fuse carrier (one trial day and 1 end days )
Hire and labour charges for maintaining of 200A Meter board with 3 Nos 200A Fuse carrier from (28 Days)
Hire and labour charges for supply,fixing and dismantling of Exhaust Fan (one trial day and 1 end days )
Hire and labour charges for maintaining of Exhaust Fan from (28 Days)
Hire and labour charges for supply,fixing and dismantling of 2 KVA inverter with 4 hours backup (one trial day and 1 end days )
Hire and labour charges for maintaining of 2 KVA inverter with 4 hours backup from (28 Days)
Hire and labour charges for supply,fixing and dismantling 100 A Change over switch for DG Set ( (one trial day and 1 end days) (SR)
Hire and labour charges for maintaining of 100 A Change over switch from (one trial day and 1 end days )(2 Days)
Hire and labour charges for supply,fixing and dismantling 250 A Change over switch for DG Set ( (one trial day and 1 end days) (SR)
Hire and labour charges for maintaining of 250 A Change over switch from (28 Days)
Hire and labour charges for supply,fixing and dismantling of 250 KVA Generator set (one trial day and 1 end days )
Hire and labour charges for maintaining of 250 KVA Generator set from (one trial day and 1 end days )
Hire and labour charges for supply,fixing and dismantling 2 TR split type AC units including erection, gas filling, Testing dismantling and transportation charges (for observer Room) (on trial day )
Hire and labour charges for maintaining of 2 TR split type AC units on (one trial day and 1 end days )
Hire and labour charges for supply,fixing and dismantling stabilizer for AC units dismantling and transportation charges (on trial day )
Hire and labour charges for maintaining of stabilizer for AC units on (one trial day and 1 end days )
Hire and labour charges for supply,fixing and dismantling of 43' inches LED TV for observers room and Media Centre (one trial day and 1 end days )
Hire and labour charges for maintaining of 43' inches LED TV for observers room and Media Centre on (one trial day and 1 end days )
Hire and labour charges for supply,fixing and dismantling of setup box for LED TV to observers room and Media Centre
Hire and labour charges for maintaining of setup box for LED TV to observers room and Media Centre on (one trial day and 1 end days )
Hire and labour charges for supply,fixing and dismantling Fire Alarm Panel(4 zone Panel) and transportation charges (on trial day and End day)
Hire and labour charges for maintaining of Fire Alarm Panel(4 zone Panel) from (28 Days)
Hire and labour charges for supply,fixing and dismantling Smoke Detector and transpo rtation charges (on trial day and End day )
Hire and labour charges for maintaining of Smoke Detector from (28 Days)
Hire and labour charges for supply,fixing and dismantling Manual Call point and transpor tation charges (on trial day and End day)
Hire and labour charges for maintaining of Manual Call point from (28 Days)
Hire and labour charges for supply,fixing and dismantling Hooter and transportation charges(on trial day and End day )
Hire and labour charges for maintaining of Hooter from (28 Days)
Hire and labour charges for supply,fixing and dismantling 2 Core 1.5 Sqmm Copper Armoured Cable (on trial day and End day )
Hire and labour charges for maintaining of 2 Core 1.5 Sqmm Copper Armoured Cable from (28 Days)
To and Fro Transportaion Charges for the above Generator set and other materials according to distance
Charges for supply filling of fuels to the Diesel Generator for all the days of use
KKP ELECTRICALS
V Muthukumar
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .