Tender Value
₹23.4 L
EMD Value
₹25,000
Closing Date
12 Sept 2022, 4:00 pmClosed
SE OMC IV CTPS PTPP PARICHHA
OFFICE OF SE OMC IV CTPS PTPP PARICHHA
Routine Preventive Maintenance overhauling of LT motors upto 170 KW LT motors Routine Breakdown Maintenance of 6.6 KV motors from 220 KW to 4600 KW along with Round the clock maintenance of 415V switchgear panel and breakers
2022_RVUNL_722349_1
T-03/OMC IV/EMD-II/PTPP/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
PARICHHA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Dy CAO CFA AND BO PTPP Parichha
₹25,000
20 Oct 2022
20 Aug 2022
13 Sept 2022
20 Aug 2022
12 Sept 2022
20 Aug 2022
Amount
Routine Maintenance of 0.4 KV LT motors of Unit-5, Unit-6 and Common Auxiliaries (BOP). As per scope of work at Part-A(I) Sl. No. 1 to 28.
Round the clock Routine , preventive & Breakdown Maintenance of complete 0.4KV switchgears system of main plant & 0.4 KV switchgears system BOP area U#5&6 of 2x250 MW, PTPP, Parichha Jhansi as per scope of work at Part-A(II) Sl. No. 1 to 12.
OVERHAULING OF LT MOTORS upto 1 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.)
OVERHAULING OF LT MOTORS above 1KW upto 5 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.)
OVERHAULING OF LT MOTORS above 5KW upto 10 KW AS PER SCOPE OF WORK AT PART-B SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 10KW upto 20 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 20KW upto 40 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 40KW upto 55 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 55KW upto 70 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 70KW upto 90 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 90KW upto 110 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 110KW upto 140 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
OVERHAULING OF LT MOTORS above 140KW upto 170 KW AS PER SCOPE OF WORK AT PART-B-I SL. NO. 1 TO18.
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 upto 1 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 1 KW upto 5 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 5 KW upto 10 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 10 KW upto 20 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 20 KW upto 40 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 40 KW upto 55 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 55 KW upto 70 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 70 KW upto 90 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 90 KW upto 110 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 110 KW upto 140 KW
INSULATION RESISTANCE IMPROVEMENT OF MOTORS as per scope of Work Part-B(II) Sl. No. 1 to 15 above 140 KW upto 170 KW
Breakdown Maintenance of RC Feeder motor eddy current clutch assembly as per scope of work Part B-(III) Sl. No. 1 to 6.
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT MOTORS upto 5 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 20 KW upto 55 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 55 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 70 KW upto 110 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 110 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
REPAIR OF MOTOR TERMINAL PLATE AND LEADS OF LT Motors above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-IV Sl. No. 1 to 2)
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 5 KW upto 20 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 20 KW upto 40 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 40 KW upto 70 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 70 KW upto 90 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 90 KW upto 135 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 1
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 2
SHIFTING OF LT MOTORS above 135 KW upto 170 KW (AS PER SCOPE OF WORK AT PART-B-V Sl. No. 3
Modification of existing eddy current drive into variable frequency driven RC feeders in Unit#5&6 of 2x250 MW, PTPP Parichha Jhansi as per scope of work part c sl. No. 1 to 10.
Replacement of bearings in Air compressor motor (6315 C4) with complete servicing as per scope of work D
Replacement of bearings in Turbine AOP/JOP motor (6314C3) with complete servicing as per scope of work D
Breakdown Maintenance of 0.4 KV LT Breakers and . as per scope of work at PART-E : (A- S. No. 1 to 35 )
retrofitting of LT Breakers to replace Existing LT modules. as per scope of work at PART-E : ( B- S. No. 1 to 20)
Routine Maintenance work of various capacities of 6.6 KV motors ranging from 220 KW to 4600 KW of 2x250 MW Unit # 5 & 6 PTEP Parichha Jhansi as per scope of work from Sl. No. 1 to 18.
Breakdown Maintenance work - Repairing of stator copper cable end of 6.6 KV Motor as per scope of work from Sl. No. 1 to 8 for Category ‘A’ motors.
Breakdown Maintenance work - Replacement of Brass terminal connector/ tail copper cable/ FRP moulding joint box/ nylon gland part as per scope of work from Sl. No. 1 to7 for Category ‘A’ motors.
Breakdown Maintenance work - Replacement of CTs of Neutral side as per scope of work from Sl. No. 1 to 5 for Category ‘A’ motors.
Breakdown Maintenance work - Replacement of phase side insulator as per scope of work from Sl. No. 1 to 5 for Category ‘A’ motors.
Breakdown Maintenance work - Removal & installation of neutral side CT connection box as per scope of work from Sl. No. 1 to 9 for Category ‘A’ motors.
Breakdown Maintenance work - Removal & installation of phase segregated/ separated terminal arrangement box to facilitate removal/ replacement/ tightness of motor internal terminals as per scope of work from Sl. No. 1 to 7 for Category ‘A’ motors.
Breakdown Maintenance work - Repairing of stator copper cable end of 6.6 KV Motor as per scope of work from Sl. No. 1 to 8 for Category ‘B’ motors.
Breakdown Maintenance work - Replacement of Brass terminal connector/ tail copper cable/ FRP moulding joint box/ nylon gland part as per scope of work from Sl. No. 1 to7 for Category ‘B’ motors.
Breakdown Maintenance work - Replacement of CTs of Neutral side as per scope of work from Sl. No. 1 to 5 for Category ‘B’ motors.
Breakdown Maintenance work - Replacement of phase side insulator as per scope of work from Sl. No. 1 to 5 for Category ‘B’ motors.
M/S PRIYA CONSTRUCTION CO.
M/S MADHU CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .