Loading…
Loading…
Tender Value
₹2.6 L
EMD Value
₹2,600
Closing Date
10 Sept 2026, 4:00 pmDue tomorrow
EXECUTIVE ENGINEER
SATHUPALLY
Estimate for Reconstruction of Damaged OT Sluice of Yerrakunta of Telegaram(V), Penuballi(M), Khammam district.(5th Call)
730527
N I T. No:05/2026-27, Dated:23.05.2026.
OPEN
Civil Works
KHAMMAM, TELANGANA
9 documents required · 7 mandatory · 2 optional
₹92
₹2,600
3 Sept 2026
3 Sept 2026
3 Sept 2026
Excavation for Structures- Mechanical Means ( Data adopted from MORTH) Earth work in excavation in all kinds of soils of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material and as directed by the Engineer-in-charge(.IRR-CCDW-1-2)
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc.,complete with initial lead upto 50 m and all lifts.(Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) IRR-CCDW-2-3
Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) IRR-CCDW- 2-9
Manufacture,Supply and delivery of 225 mm dia socket and spigot NP2 pipes including cost and conveyance of all materials and labour charges etc, complete.
Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 98 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts.
OT sluice EM Parts:Fabrication, supply, erection, testing and commissioning of sill beam,slide tracks,seal seats,guide plates etc with all accessories including cost of material,machinery,labour etc complte as per specification of drawings and approved drawings(Excluding wastage of steel @ 2.5%)
OT Sluice Gate: Fabrication, supply, erection, testing and commissioning of Skin plate,Horizontal and vertical angles , stiffeners, rubber seals ,clamps with all accessories for sluice shutters including cost of all materials, machinery, labour, seal fixing etc complete as per specification of drawings and approved drawings (Excluding wastage of [email protected]%)
OT Sluice Hoist & Hoist Bridge Gear Hoist Including Platform for Below 5 Tons Capacity(SmallGates): Fabrication, supply, erection, testing and commissioning of Embedded Parts consisting of Supporting Strucure and Platform etc with all accessories for sluice shutters including cost of all material, machinery,labour, cutting, bending, aligning, anchoring,welding, finishing etc complte as per specification of drawings (Excluding wastage of [email protected]%)
EM PARTS:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
GATES:Surface cleaning of metal surface by chemica cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with one coat of protective mastic to a thickness of 70+5 microns, followed by finishing two coats with solventless coal tar epoxy each coat with a DFT of 150+5 and the total DFT of all coats including primary coat should not be less than 350 microns with material, labour and all accessories with all leads and lifts.
HOIST & HOIST BRIDGE : Painting of Sluices for Maintenance works: Surface cleaning of metal surfaces by chemical cleaners and then by hand and power tool cleaners and removing dust. After cleaning, applying primary coat with two coat of Zinc Chromite Red oxide primer followed by finishing three coats with synthetic enamel paint with material labour and all accessories with all leads and lifts.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT 05 Yerra Kunta BID.docx
TENDER_DOCUMENT • 0.28 MB
NIT 05 Yerra Kunta BOQ.xlsx
TENDER_DOCUMENT • 0.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .