Loading…
Loading…
Tender Value
₹6.0 L
EMD Value
₹5,960
Closing Date
28 Aug 2026, 4:00 pm
Block Development officer
Union office,Watrap
Construction of Mini Sanitary Complex for P.U.P school at Nallurpatti village in Ilandhaikulam Panchayat in Watrap Block underSBM (G) 2026-27
2026_RDTN_692318_2
P4/2026/2026 Dt 07.08.2026
Open Tender
Civil Works
Works
120 days
Watrap
Refer Tender Notice
2 documents required · 2 mandatory
₹0
₹5,960
10 Aug 2026
10 Aug 2026
28 Aug 2026
10 Aug 2026
28 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Mini Sanitary Complex for P.U.P school at Nallurpatti village in Ilandhaikulam Panchayat in Watrap Block underSBM (G) 2026-27 | - | - | - | - |
| - | EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with ex | 1 | m3 | 263.78 | ₹263.52 |
| - | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete | - | m3 | 5,358.78 | - |
| - | Random Rubble masonry in CM 1:5 foundation and basement including simultaneously flush pointing including curing neat finishing, etc., complete complying with standard specifiction. | 21.62 | m3 | 5,726.11 | ₹1,23,798.5 |
| - | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | - | m3 | 6,066.26 | - |
| - | Supplying and erecting centering shuttering including necessary supports for plane | - | - | - | - |
| - | Grade Beam and Plinth Beam | 6.37 | m2 | 547.5 | ₹3,487.58 |
| - | Above Basement | 1 | m2 | 1,095 | ₹1,093.91 |
| - | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof s | - | m3 | 8,992.78 | - |
| - | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing | 3.28 | mt | 9,194.47 | ₹30,157.86 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_832422.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].