Directorate of Municipal Administration
Sanjay
Construction of Compound wall to SWM Site at TP Kolhar
DMA/2024-25/OW/WORK_INDENT20133
DMA/2024-25/OW/WORK_INDENT20133
Open
Other Works
Two Tender Document System(Two Cover)
DMA Town Panchayat Kolhar
6 documents required · 6 mandatory
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. 71.76 lakhs (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - 172 cum, Earthwork - 403.00 cum,BBM:222 cum,SSM/UCR:183cum,plaster:2380Sqm,steel: 8.74 Tonnes etc) (80% of peak rate of construction)
KPWD Contractor Registration certificate
GST and PAN certificate
Liquid assets and /or availability of credit facilities of no less than Rs.26.91 Lakhs (estimated cash flow for 3 months of peak construction period)
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. 179.40 Lakhs)
₹2,240
₹1.8 L
2 Jul 2024
2 Jul 2024
11 Jul 2024
9 Jul 2024
Construction of Compound wall to SWM Site at TP Kolhar
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand :12 graded stone aggregate 20 mm nominal size) upto...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) inc...
Providing 15 mm cement plaster on rough side of single or half brick wallfinished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corner...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed wit...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9 f...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9 f...
As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9 f...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kw3-12033 kolhar.docx
Tender Document • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .