Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
12 Jun 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
ELECTRICITY URBAN DISTRIBUTION CIRCLE, BUNGLOW NO.-9, OLD POWER HOUSE COLONY, RAILWAY STATION ROAD, GORAKHPUR
WORK AGAINST SANCTIONED PACKAGE IN BUSINESS PLAN
2023_PVVNV_806589_1
10/EUDC(G)/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
AREA OF EUDC GKP
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER EUDC
₹8,000
16 Jun 2023
29 May 2023
12 Jun 2023
29 May 2023
12 Jun 2023
29 May 2023
Amount
fo|qr uxjh; forj.k [k.M&izFke] xksj[kiqj ds vUrxZr fctusl Iyku 2023&24 esa Lohd`r iSdst la[;k 11@2023&24] 12@2023&24] 13@2023&24 ,oaa 14@2023&24 ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
LT AB Cable (3x120+1x95+1x16)sq.mm
Supply of following material/fitting complete in all respect :-
LT Three phase Distribution box
Clamp for above
Suspension Clamp with I hook (Insulated)
Dead end Clamp with I hook (Insulated)
Piercing Connector (Insulated)
LT Cable 1x35 sq mm
Nuts & Bolts
Laying, stringing, sagging, binding and jumpering of LT AB Cable (3x120+1x95+1x16)sq.mm for LT Line with fixing of Suspension Clamp with I hook (Insulated), Dead end Clamp with I hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phase Distribution box with clamp and nuts&bolts off size as per required.
Dismentling along with carriage of existing conductor from worksite to store center.
fo|qr uxjh; forj.k [k.M&f}rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r iSdst la[;k 15@2023&24] 16@2023&24 ,oa 25@2023&24 ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
LT AB Cable (3x120+1x95+1x16)sq.mm
Supply of following material/fitting complete in all respect :-
LT 3 Three phase Distribution box
LT Cable 1x35 Sqmm
LT Clamps
Clamp for Distribution box
Suspension Clamp with I hook (Insulated)
Dead end Clamp with I hook (Insulated)
Piercing Connector (Insulated)
Nut & Bolt
Laying, stringing, sagging, binding and jumpering of LT AB Cable (3x120+1x95+1x16)sq.mm for LT Line with fixing of Suspension Clamp with I hook (Insulated), Dead end Clamp with I hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phase Distribution box with clamp and nuts&bolts off size as per required.
Dismentling along with carriage of existing conductor from worksite to store center.
fo|qr uxjh; forj.k [k.M&r`rh;] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r iSdst la[;k 23@2023&24 ,oa 24@2023&24 ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
LT AB Cable (3x120+1x95+1x16)sq.mm
Supply of following material/fitting complete in all respect :-
LT 3 Three phase Distribution box
LT Cable 1x35 Sqmm
Clamps Distribution box
Suspension Clamp with I hook (Insulated)
Dead end Clamp with I hook (Insulated)
Piercing Connector (Insulated)
Nut & Bolt
Laying, stringing, sagging, binding and jumpering of LT AB Cable (3x120+1x95+1x16)sq.mm for LT Line with fixing of Suspension Clamp with I hook (Insulated), Dead end Clamp with I hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phase Distribution box with clamp and nuts&bolts off size as per required.
Dismentling along with carriage of existing conductor from worksite to store center.
fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds vUrxZr fctusl Iyku esa Lohd`r iSdst la[;k 18@2023&24 ,oa 19@2023&24 ds dk;ksZ dks djkus gsrq dk;Z dk fooj.k %&
Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :-
LT AB Cable (3x120+1x95+1x16)sq.mm
Supply of following material/fitting complete in all respect :-
LT 3 Three phase Distribution box
LT Cable 1x35 Sqmm
Clamps Distribution box
Suspension Clamp with I hook (Insulated)
Dead end Clamp with I hook (Insulated)
Piercing Connector (Insulated)
Nut & Bolt
Laying, stringing, sagging, binding and jumpering of LT AB Cable (3x120+1x95+1x16)sq.mm for LT Line with fixing of Suspension Clamp with I hook (Insulated), Dead end Clamp with I hook (Insulated), Piercing Connector (Insulated) along with installation LT Three phase Distribution box with clamp and nuts&bolts off size as per required.
Dismentling along with carriage of existing conductor from worksite to store center.
M/s Electro Shine India
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .