Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹22,174.32 (7.45%)Admitted-Finance | ₹3.2 L+₹22,174.32 (7.45%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹23,006.37 (7.73%)Admitted-Finance N A | NA | NA | 121004 | ₹3.2 L+₹23,006.37 (7.73%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 L+₹29,978.82 (10.1%)Admitted-Finance | ₹3.3 L+₹29,978.82 (10.1%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 L+₹36,543.82 (12.3%)Admitted-Finance VILL REOG PO BHALAOG TEHSIL KUMARSAIN DISTT SHIMLA HP | KUMARSAIN | SHIMLA | HIMACHAL PRADESH | ₹3.3 L+₹36,543.82 (12.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | sanjeev bhardwaj L2 | AMAN KUMAR SHARMA GOVT CONTRACTOR L3 | HIMANSH L1 | ROBIN SHARMA GOVT. CONTRACTOR L4 | sunil dutt L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 9.5 | Cum | 300 ₹2,850 | 600 ₹5,700 | 300 ₹2,850 | 90 ₹855 Lowest | 500 ₹4,750 |
| 2.00 | Excavation in foundation and trenches etc. in all types of earth work lift up to 1.50 m staking is the excavated soil not more then 3 mtr clear of the edge of the excavation and then returning the staked soil in 15cm | 50.95 | Cum | 100 ₹5,095 | 99 ₹5,044.05 | 100 ₹5,095 | 90 ₹4,585.5 Lowest | 150 ₹7,642.5 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) | 9.32 | Cum | 2,000 ₹18,640 | 1,900 ₹17,708 | 1,874 ₹17,465.68 Lowest | 3,250 ₹30,290 | 2,900 ₹27,028 |
| 4.00 | Centering and shuttering including strutting , ,propping etc . and removal of form for suspended floors, roofs ,landings, balconies and access platform | 210 | Sqm | 200 ₹42,000 | 160 ₹33,600 | 100 ₹21,000 | 65 ₹13,650 Lowest | 80 ₹16,800 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars | 1,638 | Kg | 80 ₹1,31,040 | 79 ₹1,29,402 | 80 ₹1,31,040 | 80 ₹1,31,040 | 78 ₹1,27,764 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2;4 (1 Cement: 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) | 30.01 | Cum | 4,000 ₹1,20,040 Lowest | 4,300 ₹1,29,043 | 4,000 ₹1,20,040 Lowest | 4,900 ₹1,47,049 | 5,000 ₹1,50,050 |
Tender Value
₹4.6 L
EMD Value
₹9,153
Closing Date
4 Dec 2025, 10:00 amClosed
Executive Officer
Municipal Council Mehatpur Basdehra
Co Covered nallah from HO kewal towards HO mula singh in Ward No. 4 and 5 Mehatpur basdehra Distt. Una HP
2025_UDDHP_121808_7
MCMEHATPUR/709-712
Open Tender
Civil Works
Item Rate
90 days
Mehatpur
Please refer detailed tender notice
3 documents required · 3 mandatory
₹500
Executive Officer
₹9,153
3 Jan 2026
27 Nov 2025
6 Dec 2025
27 Nov 2025
4 Dec 2025
27 Nov 2025
Amount
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Excavation in foundation and trenches etc. in all types of earth work lift up to 1.50 m staking is the excavated soil not more then 3 mtr clear of the edge of the excavation and then returning the staked soil in 15cm
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting , ,propping etc . and removal of form for suspended floors, roofs ,landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2;4 (1 Cement: 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size)
sanjeev bhardwaj (BID ID -590184)
AMAN KUMAR SHARMA GOVT CONTRACTOR (BID ID -589997)
ROBIN SHARMA GOVT. CONTRACTOR (BID ID -589609)
sunil dutt (BID ID -589425)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_178655.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .