Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-AOC | L1 | Accepted-AOC winner | |
| 2 | L2₹2.9 L+₹10,075.69 (3.58%)Rejected-AOC | L2 | Rejected-AOC not qualify |
Tender Value
₹2.2 L
EMD Value
₹2,200
Closing Date
15 Jul 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
C.C.Palwal
Pucca work
2021_HRY_179103_1
3322/25A
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
Palwal
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹2,200
Yes
2 Sept 2021
10 Jul 2021
16 Jul 2021
10 Jul 2021
15 Jul 2021
10 Jul 2021
90 days
Amount
Demolishing R.C.C work manually / by mechinacal means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer -in- charge. H.S.R Item no.5.25
Reinforced cement concrete work in beam,suspended floors roofs having slope upto 15 degree landing balconies shelves chajjas, lintals ,bands plain window sills,stairs case and spiral stair cases above plinth level,excluding the cost of centering ,shuttering ,finishing and reinforcement with 1:1.5:3(1 cement :1.5 coarse sand (zone iii) :3 graded stone aggregate 20 mm nominal size ).HSR item 6.16
providing and laying in position cement concrete of specified grade excluding the cost of centering and shutering -all work blow plinth level and upto floor iv level: 1:2:4 (1 cement:2 coarse sand (zone iii) : 4 graded stone aggregate 20 mm nominal size .) HSR 6.1.2
Centering and shuttering including strutting ,propping atc and removel of foam coap suspended floors ,roofs,landing,balconies. HSR 6.30.3
Centering and shuttering including strutting ,propping atc and removel of form foundation and footings bases of columns etc HSR item no. 6.29.1
providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work below plinth leveland upto floor IV level. 1:3:6 (1 cement: 3 Coarse sand : 6 graded stone aggregate 20mm nominal size. HSR no 6.1.4
Earth Work excavation by mechanical means (hydraulic excavator)/ manual meeans in foundation and trenches or drains (not excwwding 1.5mtr in width or 10Sqmt on plan), including dressing opf sides and remming of bottoms lift upto 1.5mtr including getting out the excavated soil and disposal of surplus excavated soil as directed with a lead of 50mtr. HSR no. 4.14.1
Brick work with common burnt clay non modular bricks of class desination 7.5 in foundation and plinth in cement mortar 1:4 as per HSR item no.7.21.1
Poining on brick work or brick flooring with cwment mortar 1:3 (1 cement: 3 fine sand); flush/ ruled/struck or weathered pointing. HSR item no.11.25.1
Steel reinforcement for RCC work where notincluded in the complete rate of RCC including Straightening, cutting, bending, placing in position, bindin, wastage, overlaps,welded joints,spacer bars, chairs,stays hangers and annaled steel wire etc.complete in all respect above plinth level. Cold twisted bar 6.34.3
Shyamveer, Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .