| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Finance | -25.04% | ₹1.8 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹24,173.61 (13.4%)Admitted-Finance | -15.00% | ₹2.0 L+₹24,173.61 (13.4%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 L+₹57,080.06 (31.6%)Admitted-Finance | -1.33% | ₹2.4 L+₹57,080.06 (31.6%) | L3 | Admitted-Finance |
| 4 | L4₹2.4 L+₹57,881.83 (32.1%)Admitted-Finance | -1.00% | ₹2.4 L+₹57,881.83 (32.1%) | L4 | Admitted-Finance |
Tender Value
₹2.4 L
EMD Value
₹4,820
Closing Date
22 Aug 2026, 6:30 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Construction of drain from PDD station to CRPF Gate at Residency Road, Jammu. CNO-114 P
2026_PWDJK_321252_5
Short e-NIT No. 40 of 2026-2027 Dated 17-08-2026
Open Tender
Civil Works
Percentage
30 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PROJECT DIVISION III
₹4,820
Office of the PWD RandB PROJECT DIVISION III JAMMU
18 Sept 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
22 Aug 2026
17 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for cleaning by engaging sweeper to collect unhygeinic material from site of work incl. dumping of rubbish for further disposal. | 2 | each | 553 | ₹1,106 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 24.78 | cum. | 592.9 | ₹14,692.06 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
4.4.7 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 2.83 | cum. | 5,202.9 | ₹14,724.21 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including
curing but excluding the cost of centering, shuttering, finishing and reinforcement. All
works upto plinth level
5.1.2 1:11⁄2:3 (1 cement : 11⁄2 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.08 | cum. | 7,788.4 | ₹55,141.87 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:
5.9.1 Foundations, footings, bases of columns etc. for mass concrete. | 148.15 | sqm. | 286.35 | ₹42,422.75 |
| 6 | Tile brick masonry with common burnt clay tile bricks of class designation 10 in
foundation and plinth including curing complete in:
6.20.4 Cement mortar 1:4 (1 cement : 4 coarse sand) | 4.25 | sqm. | 14,291.1 | ₹60,737.18 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. : 10 mm diameter | 404.57 | kg | 123.2 | ₹49,843.02 |
| 8 | Disposal of dumped mulba beyond municipal limit by way of engaging trolley including loading and unloading complete job. | 1 | each | 1,000 | ₹1,000 |
| 9 | Site clearance after completion of work by engaging labour | 2 | each | 553 | ₹1,106 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_1072043.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .