Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹20.7 L+₹3.2 L (18.4%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹23.4 L+₹5.9 L (33.8%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹23.4 L+₹6.0 L (34.0%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹24.9 L+₹7.4 L (42.4%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
17 Jul 2026, 6:00 pmClosed
Executive Engineer PWD(RandB)nagrota Jammu
Executive Engineer PWD(RandB)nagrota Jammu
Construction of Road from IIMC to Keran Tok Pattian (Under City and Town Programme for 2026-27)
2026_PWDJK_313143_23
Short e-NIT No. 28 of 2026-27/Nagrota Dated 20-6-2026
Open Tender
Civil Works
Percentage
30 days
Executive Engineer PWD(RandB)nagrota Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Executive Engineer PWD(RandB)nagrota Jammu
₹60,000
Yes
23 Jul 2026
20 Jun 2026
18 Jul 2026
22 Jun 2026
17 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour Engaged for cutting of bushes, removal of rubbish, unwanted materials during execution of work | 20 | no. | 553 | ₹11,060 |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 841.5 | 100 sqm | 2,412 | ₹20,29,698 |
| 3 | Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction of Engineer-incharge 1:3:6 or richer mix (i/c equivalent design mix) | 3.71 | cum | 1,725.2 | ₹6,400.49 |
| 4 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in All kinds of soil : | 184 | cum | 479.3 | ₹88,191.2 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 107.15 | cum | 4,826.5 | ₹5,17,159.48 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 164.08 | cum | 5,733.6 | ₹9,40,769.09 |
| 7 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 103.5 | sqm | 416.5 | ₹43,107.75 |
| 8Centering and shuttering including strutting, propping etc. and removal of form for | |||||
| 8.01 | Foundations, footings, bases of columns etc. for mass concrete | 632 | sqm | 286.35 | ₹1,80,973.2 |
| 8.02 | Suspended floors, roofs, landings, balconies and access platforms | 6.75 | sqm | 718.2 | ₹4,847.85 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1013462.xls
BOQ • 0.28 MB
extensionnotice28th.pdf
PDF • 0.29 MB
nit28corrigendum.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .