Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC PARDHI NAGAR HINGNA ROAD NAGPUR 440016 | NAGPUR | NAGPUR | MAHARASHTRA | 440016 | ₹17.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹18.1 LRejected-Finance | ₹18.1 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical The firm has not submitted required documents as per NIT |
| Sl No | Description | Qty | Unit | GIRIPUNJE CONSTRUCTION L2 | M/S VAISHNAVI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm | 3,581 | Sqm | 49 ₹1.8 L | 47 ₹1.7 L |
| 2.00 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 64.58 | Cum | 8,600 ₹5.6 L | 8,335.5 ₹5.4 L |
| 3.00 | 2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 30 with no solvent | 2,289.5 | Sqm | 300 ₹6.9 L | 289 ₹6.6 L |
| 4.00 | Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete. | 2,289.5 | Sqm | 131 ₹3.0 L | 128 ₹2.9 L |
| 5.00 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications. | 125.6 | Sqm | 750 ₹94,200 | 733 ₹92,064.80 |
Tender Value
₹17.7 L
EMD Value
₹35,500
Closing Date
31 Jan 2026, 10:00 amClosed
Commandant Engineer South Zone HQr CRPF at HYDERAB
CONTRACT CELL SOUTH ZONE HQR CRPF HYDERABAD TELANGANA
Re-carpeting of road from SOs Mess to Adm Block T point at GC, CRPF Nagpur Maharastra
2026_CRPF_895514_1
B.V-4/2025-26-SZ-Works (GC NGR) Minor Work T/042
Open Tender
Civil Works
60 days
GC CRPF Nagpur Maharashtra
AS PER NIT
3 documents required · 3 mandatory
₹0
₹35,500
27 Apr 2026
24 Jan 2026
2 Feb 2026
24 Jan 2026
31 Jan 2026
24 Jan 2026
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On bituminous surface @ 0.50 Kg / sqm
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.50% (percentage by weight of total mix) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
2.5 cm premix carpet surfacing with 2.25 cum and 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectively per 100 sqm and 52 kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG - 30 with no solvent
Providing and laying seal coat over prepared surface of road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete.
Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
BOQ_941254.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid