| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.2 LAccepted-Finance | 1 | Accepted-Finance stood the first lowest | |
| 2 | 2₹6.9 L+₹73,930 (11.9%)Rejected-Finance | 2 | Rejected-Finance stood the second lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical not full filed niet condition |
| Sl No | Description | Qty | Unit | M/s SAGAR ENTERPRISES L2 | A CHINNAIAH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in foundation trenches in saturated soil for column and plinth etc, in all type of soil with a lead up to 100 mtr and lift up to 1.5 mtr including stacking the excavted earth not more than 3 mtr from the edge of excavation and then returning the stacked soil in 15 cm layers when required in plinths and sides of the foundation, etc, including cost of all labour charges, minor tools, GST,LWC etc, complete. | 93 | Cum | 1,000 ₹93,000 | 725 ₹67,425 Lowest |
| 2.00 | Supplying and filling in plinth with pulverised stone sand under floors including, watering, ramming consoldating and dressing, GST,LWC etc, complete. | 13 | Cum | 3,000 ₹39,000 | 2,480 ₹32,240 Lowest |
| 3.00 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete cost of transportation charges of all material to work site, all labour charges, GST, LWC, minnor tools , GST,LWC etc, complete. | 133 | Sqm | 500 ₹66,500 Lowest | 800 ₹1,06,400 |
| 4.00 | Providing and laying cement concrete 1:3:6 (one cement, three mainland river sand and six stone metal of 40mm size of local quarry) for below footing, plinth beam, etc as directed by the EIC, including cost of nominal centering & shuttering charges, cost of cement, mainland river sand, stone metal, screening & washing of both the aggregate, mixing, placing, curing, GST,LWC,etc,complete. | 3 | Cum | 13,000 ₹39,000 | 8,035 ₹24,105 Lowest |
| 5.00 | Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc, and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of centering and shuttering, all LWC, GST, cost of binding materials, cost of transportation charges of all material to work site, cost of ballies, cost of minor tools, GST,LWC etc, complete. | 58 | Sqm | 500 ₹29,000 | 450 ₹26,100 Lowest |
| 6.00 | Providing and laying RCC 1:1.5:3 with 20mm size stone chips (one cement, one and half mainland river sand & three stone chips of size 2 cm graded) in all RCC works as directed by the EIC, including cost of cement, stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST, LWC etc,complete. | 13 | Cum | 16,000 ₹2,08,000 | 12,100 ₹1,57,300 Lowest |
| 7.00 | Providing and fixing Tor steel reinforcement for RCC work including cutting, bending, bindingand placing in position cost of binding wire, minor tools etc, complete. The rate is inclusive of consumable items and GST & LWC., etc., complete. | 20 | Qlt | 11,000 ₹2,20,000 | 10,350 ₹2,07,000 Lowest |
Tender Value
₹7.3 L
EMD Value
₹14,572
Closing Date
13 Aug 2025, 3:00 pmClosed
EE(NS), ALHW, Sri. vijaya puram
O/o DCE-(A),EE(NS), ALHW, Sri. vijaya puram
Construction of support/Toe wall with boulder pitching behind Type-III qtr.SC-21 and 24 at ALHW residential colony Shadipur in Sri Vijaya Puram
2025_ALHW_870007_1
Construction of support/Toe wall with boulder pitching behind Type-III qtr.SC-21and24 at ALHW reside
Open Tender
Civil Works
Works
61 days
Sri VIjaya Puram South Andaman
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹14,572
9 Oct 2025
24 Jul 2025
14 Aug 2025
25 Jul 2025
13 Aug 2025
25 Jul 2025
25 Jul 2025 - 12 Aug 2025
Amount
Earth work excavation in foundation trenches in saturated soil for column and plinth etc, in all type of soil with a lead up to 100 mtr and lift up to 1.5 mtr including stacking the excavted earth not more than 3 mtr from the edge of excavation and then returning the stacked soil in 15 cm layers when required in plinths and sides of the foundation, etc, including cost of all labour charges, minor tools, GST,LWC etc, complete.
Supplying and filling in plinth with pulverised stone sand under floors including, watering, ramming consoldating and dressing, GST,LWC etc, complete.
Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete cost of transportation charges of all material to work site, all labour charges, GST, LWC, minnor tools , GST,LWC etc, complete.
Providing and laying cement concrete 1:3:6 (one cement, three mainland river sand and six stone metal of 40mm size of local quarry) for below footing, plinth beam, etc as directed by the EIC, including cost of nominal centering & shuttering charges, cost of cement, mainland river sand, stone metal, screening & washing of both the aggregate, mixing, placing, curing, GST,LWC,etc,complete.
Providing form work including centering & shuttering so as to give a rough finish, strutting and propping etc, and removal of the same from reinforced cement concrete and plain concrete work as directed by the EIC, including cost of centering and shuttering, all LWC, GST, cost of binding materials, cost of transportation charges of all material to work site, cost of ballies, cost of minor tools, GST,LWC etc, complete.
Providing and laying RCC 1:1.5:3 with 20mm size stone chips (one cement, one and half mainland river sand & three stone chips of size 2 cm graded) in all RCC works as directed by the EIC, including cost of cement, stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator, curing, all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST, LWC etc,complete.
Providing and fixing Tor steel reinforcement for RCC work including cutting, bending, bindingand placing in position cost of binding wire, minor tools etc, complete. The rate is inclusive of consumable items and GST & LWC., etc., complete.
M/s SAGAR ENTERPRISES (BID ID -3265220)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .