Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Finance | -2.20% | ₹2.9 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 LAdmitted-Finance | +10.00% | ₹3.2 L | L2 | Admitted-Finance |
| 3 | L3₹3.4 LAdmitted-Finance | +15.00% | ₹3.4 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-NEITHER PYT NOR ADJOINING PYT |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
2 Mar 2026, 4:00 pmClosed
XEN REW Kathua
xenrew
Constt. of culvert over nallah, NHO sunita devi at Alvaad dandi wno 4
2026_RDPR_304357_1
e-NIT No.366/REW/K of 2025-26 Dated 24/02/2026 2nd call
Open Tender
Civil Works
30 days
Duggan
sbd
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹5,820
5 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
2 Mar 2026
24 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER REW DIVISION KATHUA
Name of Work;- Construction of Culvert over Nallah NHO Sunita Devi at Alvaad Dandi W.No 4, Panchayat: Bhullari Block- DUGGAN , District Kathua under Development Scheme (CDS) for the year 2025-26 ESTT AMOUNT 2.91 LACS
Contract NO:- MLACDF- 2025-26
Name of the Bidder/ Bidding Firm / Company :
S. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 3.85 cum 479.3 1000 Excess(+) Full Conversion INR
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 1.02 cum 7104.35 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) 4.6 cum 5202.9 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1cement:2 coarse sand:4 graded stone aggregate 20 mm nominal size). 3.31 cum 6591.25 1000 Excess(+) Full Conversion INR
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto & above plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% Plum 9 cum 4774.6 1000 Excess(+) Full Conversion INR
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) 2.5 cum 9821.85 1000 Excess(+) Full Conversion INR
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Mild steel and medium tensile steel bars 416.14 kg 115.35 1000 Excess(+) Full Conversion INR
Centering and shuttering etc and removal of formwork for Walls
foundation 32.92 sqm 628.95 1000 Excess(+) Full Conversion INR
suspended floors Sqm 718.2 1000 Excess(+) Full Conversion INR
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming Coat of approved steel primer all complete 104.02 kg 138.2 1000 Excess(+) Full Conversion INR
Dry random rubble massonary with hard stones : cum 2793.8 1000 Excess(+) Full Conversion INR
Dry random rubble massonary with hard stones in 1:6 cum 5402.9 1000 Excess(+) Full Conversion INR
Carriage of sand 80KM & 300M by HL 10.3 cum 1491.76 1000 Excess(+) Full Conversion INR
Aggregates 80KM & 300 HL 0.0 cum 1618.73 1000 Excess(+) Full Conversion INR
Stones @ 1km AT 0.9 Cum 1212.68 1000 Excess(+) Full Conversion INR
CIB & Photos etc 1 No 6000 1000 Excess(+) Full Conversion INR
Total in Figures Excess(+) Full Conversion INR
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.97 MB
BOQ_988659.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid