| 1 | L1₹9.2 LAccepted-AOC H NO 96 COURT ROAD OPP S D M RESIDENCE KASHIPUR DISTT U S NAGAR UTTARAKHAND | ₹9.2 L | L1 | Accepted-AOC accepted |
| 2 | L2₹11.0 LRejected-AOC | ₹11.0 L | L2 | Rejected-AOC rejected |
| 3 | L3₹11.0 LRejected-AOC M M I G B 96 RAMGANGA VIHAR PHASE 2 MORADABAD | MORADABAD | MORADABAD | UTTAR PRADESH | ₹11.0 L | L3 | Rejected-AOC rejected |
Tender Value
₹11.1 L
EMD Value
₹23,000
Closing Date
13 Nov 2025, 4:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EXECUTIVE ENGINEER AFZALGARH IRRIGATION DIVISION DHAMPUR
LOT 26 Repairing/extension of V.R.B. at Km 2.300 of Roshanpur Dy. In distt. Moradabad for the Year 2025-26
2025_UPIDC_1086669_55
04/EEAID/2025-26
Open Tender
Civil Works
60 days
MORADABAD
AS PER NIT
2 documents required · 2 mandatory
₹266
₹23,000
17 Jan 2026
8 Nov 2025
13 Nov 2025
8 Nov 2025
13 Nov 2025
8 Nov 2025
Amount
Laying and Jointing PVC Pipe. Heading
Dismantling damaged Brick work or Masonry in Lime or Cement i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete.
Dismantling damaged R.B .OR R.C.C. work i/e stacking of material with in 60 m. distance i/c all cost of labour, T&P etc. complete.
Earth work in excavation in foundation in dry soil i/c. lift upto 1.50M and lead upto 30M i/c. cost of all material, labour, T&P etc. completion.
Cement concrete 1:3:6 with 20-40 mm size stone aggregate and course sand including cost of all material, labour, T&P etc. completion.
M-105 & above brick work in 1:4 C.M. with course sand including cost of all material, labour, T&P etc. complete.
Providing and laying M-105 & above brick work with 1:4 cement mortar using cement and Coarse sand but excluding cost of bricks inclduing cost of all materials, labour, T&P, collection, cleaning & stacking of bricks etc.
P/Laying Ordinary centering and shuttering for R.C.C works i/c. all cost of material, labour, T&P etc. complete.
Cost of steel at site per M.T. bending, binding, cutting and placing in position of reinforcement i/c. all cost of binding wire i/c. cost of steel.
R.C.C(1:1.50:3) with 4.2-20 mm size stone aggregate and course sand including cost of all material, labour, T&P etc. complete.
C.C(1:2:4) in wearing coat with 4.2-20 mm size stone aggregate and course sand including cost of all material, labour, T&P etc. complete.
Struck deep cement pointing in 1:2 C:M including cost of all material, labour, T&P etc. complete.
C.C(1:2:4) in copping including cost of all material, labour, T&P etc. complete.
M-105 & above brick flooring in 1:3 C:M with 10mm thick CC bed (1:3:6) including cost of all material, labour, T&P etc. complete.
Applying snowcem in two coat including all cost material, labour and T&P etc required for proper completion of work.
Letter writing up to 10 cm Height including prepaition of base with Plaster ,primer two coat enamel paint of 0.80 m x 0.60 m including all cost material, labour and T&P etc required for proper completion of work.
Fixing R.C.C. (1:1.5:3) wheel guard size (300x300x800) mm.
Laying brick on edge kharanja i/c. cost of all material, labour, T&P etc. complete.
Providing and fixing RCC Hume Pipe (NP3) (S&S Type) of 1000mm dia I.S.I. Mark and removal and disposal of used pipe after work including all cost of materials, T&P and labour etc. complete.
Earth work in filling in strenthening of banks i/c. carriage of Earth upto 1.00 km. and lift upto 1.50m. with proper levelling, dressing, and manual compaction and earth work in removal including lift upto 1.50 M and lead upto 30 M after finishing of work
ashraf contractor (BID ID -5663625)
MAHENDRA SINGH (BID ID -5663522)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_1999300.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid