Loading…
Loading…
Tender Value
₹14.6 L
EMD Value
₹29,120
Closing Date
28 Sept 2026, 4:00 pm4d left
Executive Engineer RnB Division Langate
RnB Division Langate
Upgradation of road from Ath Khul to Jamia Masjid Lokipora along with Upgradtion of Sehdakpora link from old Masjid to Darsgah.
2026_PWDJK_325387_10
36/3399-08/2026-27/RnB/Langate Dated 19/09/2026
Open Tender
Civil Works
Percentage
90 days
Langate
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
MH 0059
₹29,120
21 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in all kinds of soil by mechinical means in trenches for foundation, drains, pipes, cables etc. (not exceeding 1.5 Mtr. In width) and for shafts, wells, cesspits and the like not exceeding 10 Sqm on plan depth up to 1.5 Mtr; including disposal of excavated earth as per the directions of engineer incharge complete job.(SOR NO 2.9) | 23.28 | Cum | 256.85 | ₹5,979.47 |
| 2 | Supply & laying of dry stone soling including hand packing and ramming including all leads lifts cost & carriages of materials involved upto site of work complete. (NON- SOR) | 5.18 | Cum | 1,000 | ₹5,180 |
| 3 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing. All work up to plinth level in 1: 4: 8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size Crushed, including all leds, lifts cost & avg carriages of materials upto site fo work complete.(SOR NO 4.4) | 3.88 | Cum | 5,577.4 | ₹21,640.31 |
| 4 | Providing & laying in position specified grade of cement concrete, including the cost of centering, shuttering, finishing, curing. All work upto plinth level in 1: 2: 4 (1 cement: 2 coarse sand: 4 graded stone aggregate) 20mm nominal size Crushed, including all carriages of materials upto site fo work complete.
(SOR NO 4.4.3) | 36.23 | Cum | 6,941.25 | ₹2,51,481.49 |
| 5 | Centering and shuttering including strutting and propping etc and removal of form work for retaining walls, walls (any thickness) inc. attached pilasters, butresses, plinth and string courses fillets etc. (SOR NO 5.9) | 138 | Sqm | 286.85 | ₹39,585.3 |
| 6 | Supply and Filling of Nallah Muck/ 2nd class Stones in Layers behind R wall incl. all carriages (NON SOR) | 15.18 | Cum | 1,000 | ₹15,180 |
| 7 | Providing and fixing of 3"PVC pipes for weaping holes. | 65 | Rm | 250 | ₹16,250 |
| 8 | Providing and laying Nallah Muck/RBM Incl Spreading in layers not exceeding 150mm compacted thickness and consoludated by 8-10 Ton per road roller at OMC to achive Max. dry density inl. all lead and carriage complete (NON-SOR) | 412.08 | Cum | 1,410 | ₹5,81,032.8 |
| 9 | Supply stacking & Laying of 63mm to 45mm quarry stone agg. at site inl. stone screening - chippings at site 13.2 mm nominal size inl moorum / binding material consolidation with Power Road Roller of 8-10 Tonne capacity All leads lifts and carriage. | 140.07 | Cum | 3,176 | ₹4,44,862.32 |
| 10 | Providing and laying of RCC spun pipes in position including earth work cutting, laying of pipes in position & re filling by excavated materials, providing sufficient cushions over pipes including loading, unloading, & including all carriages upto site of work complete. (inl. Cost of pipes | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_1099245.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .