Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.8 L+₹677.54 (0.38%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹1.9 L+₹14,518.75 (8.20%)Accepted-Finance | L3 | Accepted-Finance L3 |
Tender Value
₹2.4 L
EMD Value
₹4,840
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer
PWD (RandB) Division Udhampur
Renovation and construction of Shelves alongside of the corridor of Administrative Block at GDC Udhampur (Under Higher Education Local Fund 2026-27.
2026_PWDJK_314947_5
e-NIT 65 of 2026-27 dated 07.07.2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB Division Udhampur
₹4,840
29 Jul 2026
7 Jul 2026
14 Jul 2026
8 Jul 2026
13 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50meters lead as per direction of Engineer-in-charge. | 5.9 | Cum | 2,516.85 | ₹14,849.42 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.9 | Cum | 7,788.4 | ₹45,951.56 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls Under 20 cm wide | 98.4 | Rmt | 262.2 | ₹25,800.48 |
| 4 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) | 118.08 | Sqm | 283.8 | ₹33,511.1 |
| 5 | Disposal of mulba av lead 2 km by MT & 50 mtr by HL | 5.9 | Cum | 384.97 | ₹2,271.32 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:
Suspended floors, roofs, landings, balconies and access platforms | 59.04 | Sqm | 718.2 | ₹42,402.53 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Cold twisted bars | 590.4 | Kg | 123.2 | ₹72,737.28 |
| 8Carriage of material by M.T incl loading/unloading & stacking complete | |||||
| 8.1 | Sand av 45 KM by M.T | 4.07 | cum | 685.94 | ₹2,791.78 |
| 8.2 | Stone agg. above 40mm avg lead 10 Km | 5.31 | cum | 303.34 | ₹1,610.74 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_1020231.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .