Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 01₹2.8 CrAccepted-AOC | ₹2.8 Cr Quoted ₹290.88 | 01 | Accepted-AOC Due to lower side rates |
| 2 | 02₹298.20+₹7.32 (2.52%)Rejected-AOC H NO 164 SECTOR 8 PANCHKULA 134109 | PANCHKULA | PANCHKULA | HARYANA | 134109 | ₹298.20+₹7.32 (2.52%) | 02 | Rejected-AOC Due to higher side rates |
| 3 | 03₹299+₹8.12 (2.79%)Rejected-AOC | ₹299+₹8.12 (2.79%) | 03 | Rejected-AOC Due to higher side rates |
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
16 Apr 2021, 1:00 pmClosed
EE No 1 Bhiwani
EE No 1 Bhiwani
Upgradation and automation of the existing gaseous chlorination system under jurisdiction of PHED No 1 Bhiwani Designing, providing fixing commissioning and testing of online analyzer for turbidity and chlorine auto switchover Chlorine dry scrubber a
2021_HRY_166604_2
SE Memo No. 24181 Dated 26.03.2021
Open Tender
Civil Works
Works
180 days
Bhiwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹15,000
Yes
₹5.1 L
Yes
12 May 2021
31 Mar 2021
16 Apr 2021
31 Mar 2021
16 Apr 2021
31 Mar 2021
Amount
NS Items
Designing, providing, fixing, commissioning and testing of vacuum-operated automatic switchover gas chlorination system make Regal USA/ Eco-Chlor of CIT(USA)/Advance Chloro Systems Ltd (UK)/ Aquasafe Solutions Ltd. (UK) compatible with the existing gas chlorination system as per the detailed technical specifications on page 60-61 with three months trial run and one year defect liability period.
Designing, providing, fixing, commissioning and testing of online water quality analyzer make Regal USA/ Eco-Chlor of CIT(USA)/Advance Chloro Systems Ltd (UK)/ Aquasafe Solutions Ltd. (UK) for testing available chlorine and turbidity of water as per the detailed technical specifications on page 61-63 with three months trial run and one year defect liability period.
Designing, providing, fixing, commissioning and testing of Chlorine gas dry scrubber make Eco-Chlor of CIT(USA)/Advance Chloro Systems Ltd (UK)/ Aquasafe Solutions Ltd. (UK) consisting of support structures, ductwork of scrubber, blower, dry scrubbing tank, dry scrubbing media, prefab porta cabin, necessary piping, motors, controls, exhaust stack and essential accessories as per the detailed technical specifications on page 64-65 with three months trial run and one year defect liability period.
Designing, providing, fixing, commissioning and testing of Auto-shut off valve make Regal USA/ Eco-Chlor of CIT(USA)/Advance Chloro Systems Ltd (UK)/ Aquasafe Solutions Ltd. (UK) compatible with existing chlorine leak detectors installed as per the detailed technical specifications on page 65-66 with three months trial run and one year defect liability period.
Comprehensive maintenance of complete system from serial no. 1 to 4 in all respect including replacement of any part and consumables including reagents of original make, general insurance of item no. 1 to item no. 4, SIM data cost, network and cloud storage etc. for 1st year
Comprehensive maintenance of complete system from serial no. 1 to 4 in all respect including replacement of any part and consumables including reagents of original make, general insurance of item no. 1 to item no. 4, SIM data cost, network and cloud storage etc. for 2nd year
Comprehensive maintenance of complete system from serial no. 1 to 4 in all respect including replacement of any part and consumables including reagents of original make, general insurance of item no. 1 to item no. 4, SIM data cost, network and cloud storage etc. for 3rd year
Comprehensive maintenance of complete system from serial no. 1 to 4 in all respect including replacement of any part and consumables including reagents of original make, general insurance of item no. 1 to item no. 4, SIM data cost, network and cloud storage etc. for 4th year
Comprehensive maintenance of complete system from serial no. 1 to 4 in all respect including replacement of any part and consumables including reagents of original make, general insurance of item no. 1 to item no. 4, SIM data cost, network and cloud storage etc. for 5th year
JAI BHARAT CONSTRUCTION COMPANY
HILL CONSTRUCTION AND ENGINEERING COMPANY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .