Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical RAJASTHAN RAJASTHAN JODHPUR | Accepted-Technical Resposive |
| 2 | Accepted-Technical | Accepted-Technical Resposive |
| 3 | Accepted-Technical | Accepted-Technical Resposive |
| 4 | Accepted-Technical | Accepted-Technical Resposive |
| 5 | Accepted-Technical | Accepted-Technical Resposive |
Tender Value
₹26.7 L
EMD Value
₹53,400
Closing Date
20 Jul 2026, 6:00 pmClosed
XEN WDSC PS DHOLPUR
XEN WDSC PS DHOLPUR
ECD IN MJSA 2.2 PROJECT AREA PS DHOLPUR
2026_WDSC_574478_1
nit-01dholpur
Open Tender
Civil Works
Percentage
160 days
DHOLPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E GRASS
₹53,400
Yes
XEN WDSC PS DHOLPUR
11 Aug 2026
11 Jul 2026
21 Jul 2026
11 Jul 2026
20 Jul 2026
11 Jul 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Mkxcsfyax djuk 5 ls 7-5 lseh- xgjkbZ rd ¼vkbZVe u0 6 c ½ | 12,000 | eh- | 1.71 | ₹20,520 |
| 1.02 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkVus lfgr ¼vkbZVe ua- 191½ | 1,89,945 | oxZ eh- | 2.86 | ₹5,43,242.7 |
| 1.03 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m .( BSR IRRIGATION Chapter-V Part "B" item no 20) | 5,182.65 | ?ku eh- | 87.86 | ₹4,55,347.63 |
| 1.04 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्त मिट्टी (in Hard Soil) (BSR GKN DATE(06/10/2020) ITEM NO. 196(B) | 16,777.6 | ?ku eh- | 61.62 | ₹10,33,835.71 |
| 2.01 | Compaction of earth or highly weathered strata a. by manually or plain roller , (density 90 % of Proctor).( BSR IRRIGATION Chapter-V Part "B" item no 18(a)BSR(05/05/2022) | 16,777.6 | ?ku eh- | 22.5 | ₹3,77,496 |
| 3.01 | Watering of earth including cost of cairrage of water when source of water is up to 1 km.( BSR IRRIGATION Chapter-V Part "B" item no 28 (a) )BSR(05/05/2022) | 16,777.6 | ?ku eh- | 11.34 | ₹1,90,257.98 |
| 5.01 | ?kkl ds cht dh vkiwfrZ cktkj nj ij ¼ 1 fdyks @ysu izfr@100 ehVj 2 ysu esas ½ | 246.3 | kg | 85 | ₹20,935.5 |
| 6.01 | ?kkl dh cqokbZ ¼ 2 ysu esas ½ (ITEM NO. 159) | 23,000 | kg | 1.25 | ₹28,750 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.08 MB
BOQ_1021831.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .