Tender Value
₹3.5 L
EMD Value
₹3,450
Closing Date
15 Jul 2026, 3:00 pm7d left
Bdo,Thirumayam
Pt.union Office,Thirumayam
Providing Cement Concrete Pavement (50Metre) with Dry Fixing Pipe at Santhanaviduthi AD Colony near Pillaiayrkoil in Thulaiyanur Panchayat
2026_RDTN_683046_1
T3/550/2026/Thulaiyanur
Open Tender
Civil Works
Thirumayam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹3,450
Yes
29 Jun 2026
29 Jun 2026
15 Jul 2026
29 Jun 2026
15 Jul 2026
29 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Cement Concrete Pavement (50Metre) with Dry Fixing Pipe at Santhanaviduthi AD Colony near Pillaiayrkoil in Thulaiyanur Panchayat | - | - | - | - |
| 2 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 9 | cum | - | - |
| 3 | Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete. | 9.38 | cum | - | - |
| 4 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges etc ., | 15.5 | cum | - | - |
| 5 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 57.63 | Sqm | - | - |
| 6 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 6.25 | cum | - | - |
| 7 | Cement Concrete 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 11.25 | cum | - | - |
| 8 | Supply and fixing of Bituminous Tar Pad 12mm thick every 5m for expansion joint etc., Complete. | 2.03 | Sqm | - | - |
| 9 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 1 & 8 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tym_doc.pdf
Tender Documents • 0.14 MB
BOQ_821099.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid