Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical As per NOE |
| 2 | Accepted-Technical FATEHPUR FATEHPUR FATEHPUR RAJAURI JAMMU KASHMIR 185131 | RAJOURI | JAMMU AND KASHMIR | 185131 | Accepted-Technical As per NOE |
| 3 | Accepted-Technical | Accepted-Technical As per NOE |
| 4 | Accepted-Technical | Accepted-Technical As per NOE |
| 5 | Accepted-Technical | Accepted-Technical As per NOE |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
15 Dec 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer ED-III
Office of Executive Engineer ED-III
Fixing of Rate Contract for Maintenance/ Emergent nature of works of Distribution Network in respect of Electric Division -III Jammu for the Financial Year 2025-26 or till Tender for Financial Year 2026-27 is finalized
2025_PDD_296176_1
ED-III/Jammu/51 of 2025-26
Open Tender
Electrical Works
Item Rate
5 days
Jurisdiction of ED-III
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Executive Engineer ED-III
₹50,000
16 Feb 2026
24 Nov 2025
16 Dec 2025
24 Nov 2025
15 Dec 2025
24 Nov 2025
Fixing of Rate Contract for Maintainance/Emergent works of Distribution Network in the jurisdiction of Electric Division-III JPDCL Bhagwati Nagar Jammu. For the f
Erection of PCC 8 Mtr Pole
Erection of PCC 9 Mtr Pole
Erection of PCC 11 Mtr Pole
Erection of ST 8 Mtr Pole
Erection of ST 9 Mtr Pole
Erection of ST 11 Mtr Pole
Erection of ST 13 Mtr Pole
Dismantling of PCC Pole 8 Mtr Long
Dismantling of PCC Pole 9 Mtr Long
Dismantling of PCC Pole 11 Mtr Long
Dismantling of ST Pole 8 Mtr Long
Dismantling of ST Pole 9 Mtr Long
Dismantling of ST Pole 11 Mtr Long
Dismantling of ST Pole 13 Mtr Long
Unloading of PCC 8 Mtr Pole
Unloading of PCC 9 Mtr Pole
Unloading of PCC 11 Mtr Pole
Unloading of ST 8 Mtr Pole
Unloading of ST 9 Mtr Pole
Unloading of ST 11 Mtr Pole
Straightening of tilted ST Pole 8 mtr
Straightening of tilted ST Pole 9 mtr
Straightening of tilted ST Pole 11 mtr
Straightening of tilted PCC Pole 8 mtr
Straightening of tilted PCC Pole 9 mtr
Straightening of tilted PCC Pole 11 mtr
Unloading of ST 11 Mtr Pole
Unloading of ST 13 Mtr Pole
loading of PCC 8 Mtr Pole
loading of PCC 9 Mtr Pole
loading of PCC 11 Mtr Pole
loading of ST 8 Mtr Pole
loading of ST 9 Mtr Pole
loading of ST 11 Mtr Pole
loading of ST 13 Mtr Pole
Average carriage of PCC 8 Mtr Pole upto 100 Mtr
Average carriage of PCC 8 Mtr Pole upto 100 - 200 Mtr
Average carriage of PCC 9 Mtr Pole upto 100 Mtr
Average carriage of PCC 9 Mtr Pole upto 100 - 200 Mtr
Average carriage of PCC 11 Mtr Pole upto 100 Mtr
Average carriage of PCC 11 Mtr Pole upto 100 - 200 Mtr
Average carriage of ST 8 Mtr Pole upto 100 - 200 Mtr
Average carriage of ST 9 Mtr Pole upto 100 Mtr
Average carriage of ST 9 Mtr Pole upto 100 - 200 Mtr
Average carriage of ST 11 Mtr Pole upto 100 Mtr
Average carriage of ST 11 Mtr Pole upto 100 - 200 Mtr
Average carriage of ST 13 Mtr Pole upto 100 Mtr
Average carriage of ST 13 Mtr Pole upto 100 - 200 Mtr
Installation of Link Set
Installation of DO Set
Installation of HG Set
Installation of GO Set
Installation of LA Set
Average carriage of 25 KVA upto 100 Mtr
Average carriage of 63 KVA upto 100 Mtr
Average carriage of 100 KVA upto 100 Mtr
Average carriage of 25 KVA 100 - 200 Mtr
Average carriage of 63 KVA 100 - 200 Mtr
Average carriage of 100 KVA 100 - 200 Mtr
Average carriage of 250 KVA upto 100 Mtr
Average carriage of 300 KVA upto 100 Mtr
Average carriage of 400 KVA upto 100 Mtr
Average carriage of 500 KVA upto 100 Mtr
Average carriage of 630 KVA upto 100 Mtr
Average carriage of 250 KVA 100 - 200 Mtr
Average carriage of 300 KVA 100 - 200 Mtr
Average carriage of 400 KVA 100 - 200 Mtr
Average carriage of 500 KVA 100 - 200 Mtr
Average carriage of 630 KVA 100 - 200 Mtr
loading of 25 KVA Transformer
loading of 63 KVA Transformer
loading of 100 KVA Transformer
loading of 250 KVA Transformer
loading of 300 KVA Transformer
loading of 400 KVA Transformer
loading of 500 KVA Transformer
loading of 630 KVA Transformer
Unloading of 25 KVA Transformer
Unloading of 63 KVA Transformer
Unloading of 100 KVA Transformer
Unloading of 250 KVA Transformer
Unloading of 300 KVA Transformer
Unloading of 400 KVA Transformer
Unloading of 500 KVA Transformer
Unloading of 630 KVA Transformer
Mounting of 25 KVA Transformer
Mounting of 63 KVA Transformer
Mounting of 100 KVA Transformer
Mounting of 250 KVA Transformer
Mounting of 300 KVA Transformer
Mounting of 400 KVA Transformer
Mounting of 500 KVA Transformer
Mounting of 630 KVA Transformer
Erection of Guys in HT Line
Erection of Guys in LT Line
Earthing of Substation complete(Poles,Transformer,CT/PT,LA)
Dismantling of Link Set
Dismantling of DO Set
Dismantling of G O Set
Dismantling ofHG Set
Dismantling of LA Set
Dismantling of GO Set
Erection of Jumper Set HT Side
Erection of Jumper Set LT Side
Dismantling of Jumper Set HT Side
Dismantling of Jumper Set LT Side
Dismantling of Guys in HT Side
Dismantling of Guys in LT Side
Dismounting of 25 KVA Transformer
Dismounting of 63 KVA Transformer
Dismounting of 100 KVA Transformer
Dismounting of 250 KVA Transformer
Dismounting of 300 KVA Transformer
Dismounting of 400 KVA Transformer
Dismounting of 500 KVA Transformer
Dismounting of 630 KVA Transformer
inancial year 2025-26 or till the tender for the FY 2026-27 is finalized.
Laying/Stringing of ACSR Squirel Conductor
Laying/Stringing of ACSR Weasel Conductor
Laying/Stringing of ACSR Rabbit Conductor
Dismentling of ACSR Squirrel Conductor
Dismentling of ACSR Weasel Conductor
Dismentling of ACSR Rabbit Conductor
Dismentling of ACSR Dog Conductor
Tightening of loose conductor Squirrel/Weasel
Tightening of loose conductor Rabbit/Dog
Route clearance for making path for Corridor of 5 mtr./KM
Cement Bottoming of PCC/ST Poles of all sizes (Material for Cement Bottoming is to be provided by contractor)
Fixing of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Dismantling of LT Circuit Component of Substation (LT cables,Thimbles,Busbar,Shackle insulators) with Fuse Set / MCCB with Box
Branch Cutting
Unloading T & P items i.e Line materials Substations/HT/LT lines
Loading T & P items i.e Line materials Substations/HT/LT lines
Average carriage of T & P items i.e Line materials Substations/HT/LT linesupto 100 Mtr
Average carriage of T & P items i.e Line materials Substations/HT/LT lines 100 - 200 Mtr
Survey/Route Alignment
Drilling of Holes /Each
Laying/Stringing of ACSR Dog Conductor
Fixing/Installation of 11 KV Disc Insulators with fittings
Dismentling of 11 KV Disc Insulators with fittings
Fixing of U-Clamps and Shackle Insulators
Dismentling of U-Clamps and Shackle Insulators
Fixing of 11 KV Pin Insulators with Pins
Dismentling of 11 KV Pin Insulators with Pins
Fixing of Top Clamps for Pin Insulators
Dismentling Fixing of Top Clamps for Pin Insulators
Fixing of Braces
Dismentling Fixing of Braces
Fixing of Danger Plates
Dismantling of Danger Plates
Fixing of Anti Climbing Devices Plates
Dismentling Fixing of Anti Climbing Devices Plates
Painting of Steel Tubular Poles Including Cross arms clamps etc. (Upto 9 Mtr.)
Painting of Steel Tubular Poles Including Cross arms clamps etc. (Above 9 Mtr.)
Painting of Cross arms and Clamps of PCC/Wooden Poles.
Providing of earthing (Spiral/Pipe/Rod Type) including fixing to the pole and cross arm etc.
Fixing of Spacers for LV Lines (for 5 Wire System)
Fixing of Spacers for LV Lines (for 4 Wire System)
Fixing of Spacers for LV Lines (for 3 Wire System)
Fixing of Pre fabricated bracket and cross arm bed for placement of transformer (for transformers upto includiung 250 KVA)
Fixing of MS Channels 4.5/3 feet long along with Braces
Fixing of M S Angle Iron 9 feet long crossarm
Fixing of MS Angle Iron 5/4.5/3 feet long crossarm
Unloading of CT/PT Unit
Average carriage of CT/PT Unit upto 100 Mtr
Average carriage of CT/PT upto 100 - 200 Mtr
Erection of CT/PT Unit along with Trivector Meter
Erection of CTPT Unit
Dismantling of Damaged CT/PT Unit
Erection of Prodigy Meter
Dismantling of Damaged Prodigy Meter
Installation of 1- Phase Energy meter with box
Installation of 3- Phase Energy meter with box
Testing and commissioning of CT/PT Unit
Fixing of Suspension/Anchoring Clamps
Laying of HT AB Cable 35 mmsq
Laying of HT AB Cable 50 mmsq
Laying of HT AB Cable 70 mmsq
Laying of HT AB Cable 95 mmsq
Laying of HT AB Cable 120 mmsq
Laying of HT AB Cable 185 mmsq
Laying of HT AB Cable 300 mmsq
Laying of HT AB Cable 400 mmsq
Laying of HT XLPE Cable 35 mmsq
Laying of HT XLPE Cable 50 mmsq
Laying of HT XLPE Cable 70 mmsq
Laying of HT XLPE Cable 95 mmsq
Laying of HT XLPE Cable 120 mmsq
Laying of HT XLPE Cable 185mmsq
Laying of HT XLPE Cable 300 mmsq
Laying of HT XLPE Cable 400 mmsq
Laying of LT AB Cable 35 mmsq
Laying of LT AB Cable 50 mmsq
Laying of LT AB Cable 70 mmsq
Laying of LT AB Cable 95 mmsq
Laying of LT AB Cable 120 mmsq
Laying of LT AB Cable 185 mmsq
Laying of LT AB Cable 300 mmsq
Laying of LT AB Cable 400 mmsq
Laying of LT XLPE Cable 35 mmsq
Laying of LT XLPE Cable 50 mmsq
Laying of LT XLPE Cable 70 mmsq
Laying of LT XLPE Cable 95 mmsq
Laying of LT XLPE Cable 120 mmsq
Laying of LT XLPE Cable 185 mmsq
Laying of LT XLPE Cable 300 mmsq
Laying of LT XLPE Cable 400 mmsq
Dismantling of HT AB Cable 35 mmsq
Dismantling of HT AB Cable 50 mmsq
Dismantling of HT AB Cable 70 mmsq
Dismantling of HT AB Cable 95 mmsq
Dismantling of HT AB Cable 120 mmsq
Dismantling of HT AB Cable 185mmsq
Dismantling of HT AB Cable 300 mmsq
Dismantling of HT AB Cable 400 mmsq
Dismantling of HT XLPE Cable 35 mmsq
Dismantling of HT XLPE Cable 50 mmsq
Dismantling of HT XLPE Cable 70 mmsq
Dismantling of HT XLPE Cable 95 mmsq
Dismantling of HT XLPE Cable 120 mmsq
Dismantling of HT XLPE Cable 185mmsq
Dismantling of HT XLPE Cable 300 mmsq
Dismantling of HT XLPE Cable 400 mmsq
Dismantling of LT AB Cable 35 mmsq
Dismantling of LT AB Cable 50 mmsq
Dismantling of LT AB/ Cable 70 mmsq
Dismantling of LT AB Cable 95 mmsq
Dismantling of LT AB Cable 120 mmsq
Dismantling of LT AB Cable 185 mmsq
Dismantling of LT AB Cable 300 mmsq
Dismantling of LT AB Cable 400 mmsq
Dismantling of LT XLPE Cable 35 mmsq
Dismantling of LT XLPE Cable 50 mmsq
Dismantling of LT XLPE Cable 70 mmsq
Dismantling of LT XLPE Cable 95 mmsq
Dismantling of LT XLPE Cable 120 mmsq
Dismantling of LT XLPE Cable 185 mmsq
Dismantling of LT XLPE Cable 300 mmsq
Dismantling of LT XLPE Cable 400 mmsq
Fixing of Heat Shrinkable Outdoor Kit for AB/XLPE cables of HT Lines
Fixing of Straight Through Cable Jointing Kit for AB/XLPE cables of LT Lines
Dismantling of Pin Insulators
Dismantling of MS Channels 4.5/3 feet long along with Braces
Dismantling of M S Angle Iron 9 feet long
Dismantling of MS Angle Iron 5/4.5/3 feet long
Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by department for this item)
Construction of Cemented Platform (8x8x6 feet) for 630/400 KVA Substation along with Mesh Fencing of 6 feet height( If Material to be provided by Contractor for this item)
Fixing of IPC 120/50mm
Service connection (Domestic/Commercial)
Laying of LT PVC Single Core Cable 95 mmsq
Laying of LT PVC Single Core Cable 185 mmsq
Laying of LT PVC Single Core Cable 300 mmsq
Laying of LT PVC Single Core Cable 400 mmsq
Laying of LT PVC Single Core Cable 630 mmsq
Fixing of Al. Thimbles of different Sizes 95 mmsq
Fixing of Al. Thimbles of different Sizes 185 mmsq
Fixing of Al. Thimbles of different Sizes 300 mmsq
Fixing of Al. Thimbles of different Sizes 400 mmsq
Fixing of Al. Thimbles of different Sizes 630 mmsq
Stone Pad (300 mmx 300 mm x 75 mm)
Fixing of Aluminium Jointing Sleeves
Fixing of Suspension/Tension Clamp with eye hook
Fixing of Wedge connectors/PG Clamps
Fixing of GI Barbed wire for anti climbing
Sundry items like aluminium Lugs, jumpers, binding , Tape.
Fixing of LT Distribution Box for 63/100 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Fixing of LT Distribution Box for 200/250/300/400 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Laying of 3 and a half core PVC 95 mmsq LT XLPE Cable/ AB Cable
Fixing of LT Distribution Box for 500/630 KVA DTR with MCCB for incomer & SFU's for Outgoing Circuits
Fixing of Nuts & Bolts
Fixing of 32/63 amps TPN Switch Disconnector Fuse Unit
Topping of Transformer oil
Replacement of damaged bush rods.
Shift
Watch and Ward of Allied Material
Dismantling and Re erection of 25KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
Dismantling and Re erection of 63KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
Dismantling and Re erection of 100KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
Dismantling and Re erection of 250KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
Dismantling and Re erection of 400KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
Dismantling and Re erection of 500 KVA S/Stn Complete alongwith Poles/Channels/Cables Complete Job
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.76 MB
Tendernotice_2.pdf
PDF • 1.56 MB
GTP.pdf
Tender Documents • 7.50 MB
BOQ_959428.xls
BOQ • 0.37 MB
RECDrawings.pdf
Tender Documents • 3.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .