Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical Technical Condisitions Not Qualified |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
25 Sept 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer (D-2) Trans Gomti, LESA, L
Superintending Engineer (D-2) Trans Gomti, LESA, Lucknow
Execution of works against sanctioned package in business plan at various places under the jurisdiction of EE, EUDD-Chinhut and Gomtinagar, LESA, Lucknow
2020_MVVNL_513539_1
24/EUDC-II/2020-21
Open Tender
Electrical Works
Fixed-rate
180 days
EE, EUDD-Chinhut and Gomtinagar, LESA
As Per Tender Document
2 documents required · 2 mandatory
₹3,540
EE, EUTD II, Lesa, Lucknow
₹25,000
15 Oct 2020
20 Sept 2020
25 Sept 2020
20 Sept 2020
25 Sept 2020
20 Sept 2020
180 days
Amount
Safe loading carriage including unloading and proper stacking of following materials from Central Store Barabanki / JE Store to site of work.
PCC Pole 8.5 M
ST Pole 11 M long
ACSR Weasel Conductor
11/0.4 kV 63 KVA Transformer
11/0.4 kV 100 KVA Transformer
11 kV 3x185 Sq. mm XLPE cable
33 kV 3x300 Sq. mm XLPE cable
ID/OD box for 3x185,3x120,3x70 mm XLPE cable & Strait through
Distribution box
33KV Box Straight through
11 KV VCB
33 KV VCB
33KV ID/OD box for 3x185,3x120,3x70 mm XLPE cable & Strait through
Other line material like steel section, GI Wire etc
LT Cable (3.5x240/3.5x400 sqmm.)
Erection, Grouting , plinthing of Substation type double pole with ST Pole 11 M long including mounting of Top Channel, Dropper Channel, base angle with clamps and nut and bolts As per RESSPO norms (11 KV Pin insulator & Pole shall be supplied by deptt.)
Erection of Single PCC pole 8.5 mtr/11 mtr ST Pole for HT line with X-arm & pin insulator including grouting & plinthing. As per RESSPO norms (11 KV Pin insulator & X-arm, Pole shall be supplied by deptt.)
Erection, Grouting , plinthing of Single ST Pole 11 M long /8.5 mtr. long PCC Pole for LT line including fitting clamps A Per RESSPO norms (only Pole shall be supplied by deptt.)
Erection of stay set of 16X1800 mm rod duly painted with red oxide, anchor plate, thumble turn buckle and stay insulator etc. digging of pit of size 0.4X0.6X1.6m for grouting by 1:3:6 cement concrete, with stay of size 7/8 swg, nuzzling & grouting.
Stringing and sagging of 11 kV line with ACSR weasel Conductor including nuzzling, binding and jumpering (Weasel Conductor will be provided by the department)
Boring type earthing of 11/0.4 KV KVA Substation by boring and lowering of 25 Ft. deep or upto water level 1.5” dia B Class Jindal make GI Pipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor)
Providing & fixing of 11 KV TPMO Set with all accessories and clamps( all materials shall be borne by the contractor) as per RESSPO Norms
Providing & fixsing of 11 KV D O fuse set
Stringing & sagging of ABC of 3x120 + 1x95+1x16 mm on erected single PCC pole including mounting of Clamps and connectors like Suspension clamp, Dead end with Eye Hook. (Only ABC will be provided by the department)
11/0.4 kV 63 KVA Transformer
11/0.4 kV 100 KVA Transformer
mounting of distribution box on pole ( box shall be provied by deptt.
Laying of Single circuit 11 kV 3x70 Sq., 3x120Sq., 3x185 Sq. mm XLPE cable by Drilling method. The cable will be laid by drilling machine at the depth of 1.5 M from the ground level which may vary as per site condition. Distance in between both the circuits will be maintained 0.15 to 0.25 M through out the line (Only cable will be provided by the department & drilling machine will be arranged by the contractor)
Laying of Single circuit 33 kV 3x300 Sq. mm XLPE cable by manualmethod. The cable will be laid by drilling machine at the depth of 1.5 M from the ground level which may vary as per site condition. Distance in between both the circuits will be maintained 0.15 to 0.25 M through out the line (Only cable will be provided by the department & drilling machine will be arranged by the contractor)
Hoisting of 11KV 3x185, 3x120, 3x70 Sq. mm XLPE cable on double pole with proper clamping & jumpering. The cable will be passed through MS pipe of size 200 mm dia & pipe will be clamped with pole at the bottom, middle & top of the MS pipe (All the material will be arranged by the contractor except cable.)
Fixing of M.S. Channel of size 75x50x6 mm
Changing Over Swich
installation of 33 kv VCB on existing structure
jumpering of 33 kv VCB
installation VCB including its inter conncation with existing VCB
Laying of LT Cable
Demounting , loading transformer 16 to 63 KVA & Carriage from site to store
ARIHANT ELECTRIC COMPANY
M/S MANSA ENTERPRISES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .