Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-AOC | ₹1.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.6 Cr+₹12.2 L (8.43%)Rejected-Finance 0 RAGHAVPUR ORHA TIKAMGARH DISTRICT TIKAMGARH MADHYA PRADESH | TIKAMGARH | TIKAMGARH | MADHYA PRADESH | ₹1.6 Cr+₹12.2 L (8.43%) | 2 | Rejected-Finance L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical The Character Certificate of the Partner was not submitted, the required experience in Similar Nature of Work was not found, and the Income Tax Returns (ITRs), balance sheet for the last three financial years were not uploaded, so not Qualify with th |
| Sl No | Description | Qty | Unit | M/S TULSIRAM AND COMPANY L1 | M/s Suresh Chand Gupta L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying & fixing local khutas 7.5 cm. to 10 cm. in dia
1.2 to 1.8 m. in height including all cost of labour & T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 12,000 | No. | 42 ₹5,04,000 | 40 ₹4,80,000 Lowest |
| 2.00 | Jungle clearance cutting under heavy growth and bushes ,removal of roots including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 75,000 | Sqm | 5 ₹3,75,000 Lowest | 5 ₹3,75,000 Lowest |
| 3.00 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling,watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,077.38 | Cum | 98 ₹1,05,583.24 Lowest | 108 ₹1,16,357.04 |
| 4.00 | Providing & laying in position cement concrete of M-15 grade (01 cement : 02 sand : 04 aggregate )including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 126.75 | Cum | 4,510 ₹5,71,642.5 Lowest | 4,900 ₹6,21,075 |
| 5.00 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding wire all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 36,780 | Kg | 65.5 ₹24,09,090 Lowest | 72 ₹26,48,160 |
| 6.00 | Centering & shuttering for R.C.C. work including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,700 | Sqm | 855 ₹23,08,500 Lowest | 935 ₹25,24,500 |
| 7.00 | Providing & laying in reinforced cement concrete of M-20 grade (01 cement : 1.5 sand : 03 aggregate) including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,119.38 | Cum | 5,633 ₹63,05,467.54 Lowest | 6,100 ₹68,28,218 |
| 8.00 | 12.5 mm thick Cement plaster in 1:4 CM including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,887.5 | Sqm | 138 ₹3,98,475 Lowest | 150 ₹4,33,125 |
| 9.00 | Painting two coat of synthetic enamel paint (Excluding cost of primer) superior quality such as Luxol Higloss, Apcolite, Superlac, Dulux, including cost of all material, labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,887.5 | Sqm | 102 ₹2,94,525 Lowest | 110 ₹3,17,625 |
| 10.00 | Painting letters including cost of paint ,T&P, labour, etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,44,000 | No. | 8 ₹11,52,000 Lowest | 9 ₹12,96,000 |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
3 Aug 2026, 11:00 amClosed
Superintending Engineer, IVth Circle Irrigation Wo
Office of the Superintending Engineer, IVth Circle IW Jhansi
LOT-07, Demarcation of Submergence Area of Matatila Dam and Other Departmental Land in District Lalitpur
2026_UPIDC_1164587_12
02/SE-IV/2026-27
Open Tender
Civil Works
Item Wise
330 days
Talbehat
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,897
₹3.2 L
31 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
3 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying & fixing local khutas 7.5 cm. to 10 cm. in dia
1.2 to 1.8 m. in height including all cost of labour & T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 12,000 | No. | 46.9 | ₹5,62,800 |
| 2 | Jungle clearance cutting under heavy growth and bushes ,removal of roots including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 75,000 | Sqm | 5.5 | ₹4,12,500 |
| 3 | Excavation of foundation in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling,watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,077.38 | Cum | 108.2 | ₹1,16,572.52 |
| 4 | Providing & laying in position cement concrete of M-15 grade (01 cement : 02 sand : 04 aggregate )including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 126.75 | Cum | 4,959.83 | ₹6,28,658.45 |
| 5 | Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding wire all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 36,780 | Kg | 72.24 | ₹26,56,987.2 |
| 6 | Centering & shuttering for R.C.C. work including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,700 | Sqm | 939.6 | ₹25,36,920 |
| 7 | Providing & laying in reinforced cement concrete of M-20 grade (01 cement : 1.5 sand : 03 aggregate) including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,119.38 | Cum | 6,191.23 | ₹69,30,339.04 |
| 8 | 12.5 mm thick Cement plaster in 1:4 CM including all cost of labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,887.5 | Sqm | 151.54 | ₹4,37,571.75 |
| 9 | Painting two coat of synthetic enamel paint (Excluding cost of primer) superior quality such as Luxol Higloss, Apcolite, Superlac, Dulux, including cost of all material, labour, T&P etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 2,887.5 | Sqm | 112.7 | ₹3,25,421.25 |
| 10 | Painting letters including cost of paint ,T&P, labour, etc. complete in all respects as per the direction and full satisfaction of the Engineer-in-Charge | 1,44,000 | No. | 9.4 | ₹13,53,600 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.24 MB
BOQ_2202271.xls
BOQ • 0.43 MB
02SEIVNIT2026-27.pdf
Tender Documents • 2.78 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .