Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹28.6 L+₹82,619.84 (2.98%)Rejected-Finance | ₹28.6 L+₹82,619.84 (2.98%) | L2 | Rejected-Finance High Rate |
| Sl No | Description | Qty | Unit | JESUS AUGUSTINE AROCKIAM L1 | SUSAI MANICKAM CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Part 1 : Providing CC Road from 4th Cross Street fathima House to Masoothi at Bharani Nagar in Kuttiyapatti H/O Pillaiyarnatham Estimate Amount : Rs. 14.00 lakhs | |||||
| 2.00Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | |||||
| 3.00 | Core wall | 38.34 | cum | 131 ₹5,022.54 Lowest | 134 ₹5,137.56 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. | 80.94 | cum | 5,515 ₹4,46,384.1 Lowest | 5,680 ₹4,59,739.2 |
| 5.00 | Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete. | 255.6 | SQM | 547 ₹1,39,813.2 Lowest | 563 ₹1,43,902.8 |
| 6.00 | CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 29.39 | cum | 6,816 ₹2,00,322.24 Lowest | 7,020 ₹2,06,317.8 |
| 7.00 | CC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 51.12 | cum | 7,363 ₹3,76,396.56 Lowest | 7,583 ₹3,87,642.96 |
| 8.00 | Bitumen pad to site and all labour charges etc., complete. | 10.32 | SQM | 234 ₹2,414.88 Lowest | 241 ₹2,487.12 |
| 9.00 | Provision for Name Board | 1 | NO | 4,500 ₹4,500 Lowest | 4,635 ₹4,635 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,11,474 ₹2,11,474 Lowest | 2,17,775 ₹2,17,775 |
Tender Value
₹28 L
EMD Value
₹28,000
Closing Date
2 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER ATHOOR
BLOCK DEVELOPMENT OFFICER ATHOOR
Providing CC Road in Bharathi nagar at ATHOOR BLOCK 114
2026_RDTN_667811_1
TN 05 114 PERI URBAN 2025-2026 ATHOOR BLOCK
Open Tender
Civil Works - Roads
Item Rate
180 days
BLOCK DEVELOPMENT OFFICER ATHOOR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹28,000
Yes
30 Jun 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
2 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 1 : Providing CC Road from 4th Cross Street fathima House to Masoothi at Bharani Nagar in Kuttiyapatti H/O Pillaiyarnatham
Estimate Amount : Rs. 14.00 lakhs | - | - | - | - |
| 2 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | - | - | - | - |
| 3 | Core wall | - | cum | - | - |
| 4 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including watering whenever necessary and laid in layers not more than 15cm thick compacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. | 1 | cum | - | - |
| 5 | Towards the centring charges for sides etc., complete conveyance of all materials & labour charges etc., complete. | 1 | SQM | - | - |
| 6 | CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | - | cum | - | - |
| 7 | CC 1:1.5:3 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 1 | cum | - | - |
| 8 | Bitumen pad to site and all labour charges etc., complete. | - | SQM | - | - |
| 9 | Provision for Name Board | - | NO | - | - |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 1.40 MB
BOQ_802326.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .