| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance BIKANER BIKANER RAJASTHAN | +2.18% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹2.8 L (1.89%)Admitted-Finance | +4.11% | ₹1.5 Cr+₹2.8 L (1.89%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹4.5 L (3.00%)Admitted-Finance | +5.25% | ₹1.5 Cr+₹4.5 L (3.00%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹8.3 L (5.56%)Admitted-Finance | +7.86% | ₹1.6 Cr+₹8.3 L (5.56%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹10.1 L (6.78%)Admitted-Finance | +9.11% | ₹1.6 Cr+₹10.1 L (6.78%) | L5 | Admitted-Finance |
Tender Value
₹1.7 Cr
EMD Value
₹3.4 L
Closing Date
25 Aug 2026, 6:00 pmClosed
SE PWD CIRCLE DIDWANA
SE PWD CIRCLE DIDWANA
Construction of Atal Pragati Path From Reliance Tower to Bijaraniyo Ki Dhani via Radha Krishan Ji Mandir In Village Ghatawa Km 0/0 to 1/900
2026_CEPWD_591357_2
NIT No 05 of 2026-27 SE PWD CIRCLE DIDWANA
Open Tender
Civil Works
Percentage
150 days
KUCHAMAN CITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
EE PWD DN KUCHAMAN CITY, MD RISL JAIPUR
₹3.4 L
Yes
3 Sept 2026
20 Aug 2026
26 Aug 2026
20 Aug 2026
25 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 0.95 | Hect | 10,374 | ₹9,855.3 |
| 2 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 2,205 | Cum | 25 | ₹55,125 |
| 3 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 3,990 | Cum | 44 | ₹1,75,560 |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 2,385 | Cum | 407 | ₹9,70,695 |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate By Mechanical Means | 907.5 | Cum | 1,002 | ₹9,09,315 |
| 6 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 602.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a concrete mixer of not less than 0.5 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed Side Formwork (steel channel, laying and fixing of 150 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately) | 2,420 | Cum | 4,811 | ₹1,16,42,620 |
| 7 | Providing and Fixing of Dowel Bars and Tie Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 1,225.63 | Kg | 66 | ₹80,891.58 |
| 8 | Construction of Foundation / Inaugration Pedastal in 23 cm thick Brick masonry in CM 1:4 of size 1.20m x 1.80m above ground level with adequate foundation including providing and fixing of Granite stone of size 0.75m x0.60m with engraving letters and figures,cement plaster,white washing etc. complete as per direction of Engineer in charge. | 2 | Each | 9,547 | ₹19,094 |
| 9 | Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 213 | Cum | 137 | ₹29,181 |
| 10 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703, 2102 & 2104 P.C.C grade M 10 Nominal mix 1:3:6 | 35.5 | Cum | 2,584 | ₹91,732 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_1050039.xls
BOQ • 0.34 MB
11.pdf
PDF • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .