Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Fee/PreQual/Technical/Finance VILL BANDU PO LAWALONG DISTT CHATRA | CHATRA | -12.46% | ₹35.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹38.0 L+₹3.0 L (8.44%)Admitted-Fee/PreQual/Technical/Finance | -5.07% | ₹38.0 L+₹3.0 L (8.44%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹38.1 L+₹3.0 L (8.64%)Admitted-Fee/PreQual/Technical/Finance PANCHSHEEL NAGAR PANDRA MEHAL RANCHI | -4.90% | ₹38.1 L+₹3.0 L (8.64%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹40.0 L
EMD Value
₹80,100
Closing Date
15 Sept 2026, 5:00 pmClosed
EE RDSD CHATRA
RDSD CHATRA
Construction of P.C.C. Road From H/O Binay Kumar to Jhabra Nadi in Village- Teliyadih ,GramPanchayat - Nawadih, Block- Tandwa of Chatra District.
2026_RDSPL_118455_1
RDD/SD/CHATRA/27/2026-27/Gr_3
Open Tender
Civil Works
Percentage
90 days
CHATRA
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹80,100
18 Sept 2026
9 Sept 2026
18 Sept 2026
9 Sept 2026
15 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish Road Land. up to a lead of 50 metres outside the periphery of the area. By Manual Means) S.O.R. PART - A Item No. 2.02 | 0.11 | M3 | 19,760.3 | ₹2,173.63 |
| 2 | Excavation in soil by Manual Means (Excavation for roadway in soil using mannual means including loading in Truck for carrying of cut earth to embankment site with all lifts and lead upto 1000 metres.) S.O.R. Items No. 3.01 | 100.65 | M3 | 246.5 | ₹24,810.23 |
| 3 | Construction of Embankment with materials Deposited from Roadway Cutting (Construction of Embankment with approved materials deposited at site from roadway cutting and excavation frpm drain and foundation of other structures graded and compacted to meet required slope and compacted to meet requirement of table No. 300-2) Rate per cum after adding royality @ Rs.27.48/cum
SOR item no- 3.17(iii) | 40.26 | M3 | 61.48 | ₹2,475.18 |
| 4 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
S.O.R. Item No. 3.18 | 73.2 | M3 | 131.3 | ₹9,611.16 |
| 5 | Granular Sub-base with Close Graded Material (Table:- 400-1) By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
(i) for grading- I Material
S.O.R. Item No. R.W.D 4.01 B (II) | 150.98 | M3 | 1,316.7 | ₹1,98,795.37 |
| 6 | Providing and laying in Position cement concrete of specified grade excluding the cost of centering and shuttering- All work upto plinth level 1:1.5:3(1 cement : 1.5 Coarse sand(zone-(iii) : 3 graded stone aggregate 20 mm nominal size.
S.O.R. Item No. B.C.D 5.3.1.1 | 186.05 | M3 | 4,961.73 | ₹9,23,129.87 |
| 7 | Centering and Shuttering including strutting, propping etc. and removal of form for foundation, footing,bases of columns. Etc. for mass concrete
S.O.R. Item No. B.C.D 5.3.1.1 | 122 | M2 | 194.5 | ₹23,729 |
| 8 | Earth work in excavation in foundation trenches in ordinary soil -do- -do- complete as per building specification and direction of E/I.item -5.1.1+5.1.2 | 254.9 | M3 | 167.33 | ₹42,652.42 |
| 9 | Providing sand filling in foundation trenches -do- -do- all complete job as per specification and direction of E/I. -5.1.10 | 21.2 | M3 | 589.51 | ₹12,497.61 |
| 10 | Providing and laying in position coment concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 cement :2 coarse sand (zone- lll) : 4 graded stone aggregate 40 mm nominal size -5.3.1.2 | 21.2 | M3 | 4,598.23 | ₹97,482.48 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
SBD03.pdf
Tender Documents • 0.61 MB
BOQ_160158.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .