Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.3 CrAdmitted-Finance S O GHULAM MOHD R O BOGDANG | -4.79% | ₹3.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.4 Cr+₹13.1 L (3.98%)Admitted-Finance | -1.00% | ₹3.4 Cr+₹13.1 L (3.98%) | L2 | Admitted-Finance |
| 3 | L3₹3.5 Cr+₹20.0 L (6.08%)Admitted-Finance LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING LEH | +1.00% | ₹3.5 Cr+₹20.0 L (6.08%) | L3 | Admitted-Finance |
Tender Value
₹3.5 Cr
EMD Value
₹8.2 L
Closing Date
22 Apr 2026, 4:00 pmClosed
Executive Engineer Construction Division Leh
Office of the Executive Engineer Construction Division Leh
Construction of Community Hall Rangishel Sakti. (District Capex
2026_PWD_18647_2
184 of CDL/2025-26
Open Tender
Civil Works - Buildings
Percentage
730 days
leh
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
Executive Engineer Construction Division Leh
₹8.2 L
30 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
22 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30cm in depth,1.5m in width as well as10sqm on plan) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m, as directed by Engineer-in-charge.
a) All kinds of soil. | - | Cum | 208.42 | - |
| 2 | b) Ordinary rock | - | Cum | 383.89 | - |
| 3 | Filling availableexcavatedearth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm indepth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | - | Cum | 220.41 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 6,606.08 | - |
| 5 | b) 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | Cum | 5,725.33 | - |
| 6 | Dumping stone including cost of stones.
in Horizontal on level | - | Cum | 953.03 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for :
a) Foundations, footings, bases for columns | - | Sqm | 306.15 | - |
| 8 | b) Suspended floors, roofs, landings, balconies and access platform | - | sqm | 738.64 | - |
| 9 | c) Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | Sqm | 602 | - |
| 10 | d) Columns, piers, abutments, pillars, posts and struts | - | Sqm | 769.01 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
BOQ_44879.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .