| 1 | L1₹20.5 LAccepted-AOC KARUR | ₹20.5 L | L1 | Accepted-AOC Addmited |
| 2 | L2₹20.7 LRejected-AOC | ₹20.7 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SPE Construction L1 | K Sundaramoorthy L2 |
|---|---|---|---|---|---|
| 1.001. Renewal the BT Road From Elathagiri – Varattanapalli Road to Madhanakuppam Via Ramnagar Valayalkarankottai KM 0/0-1/2 H/O Palepalli | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 720 | Sqm | 6.35 ₹4,572 | 6.43 ₹4,629.60 |
| 3.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 120 | Sqm | 340.83 ₹40,899.60 | 344.61 ₹41,353.20 |
| 4.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 81 | Cum | 140.24 ₹11,359.44 | 141.8 ₹11,485.80 |
| 5.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 0.18 | Sqm | 4,826.11 ₹868.70 | 4,879.72 ₹878.35 |
| 6.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 3,776.25 | Sqm | 34.34 ₹1.3 L | 34.72 ₹1.3 L |
| 7.00 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 113.29 | Sqm | 11,667.12 ₹13.2 L | 11,796.73 ₹13.4 L |
| 8.00 | Provision for Road marking with hot applied Themoplastic compound with Reflectorining glass beads in Bituminous surface | 200.75 | Sqm | 889.29 ₹1.8 L | 899.17 ₹1.8 L |
| 9.00 | Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete | 2.81 | Sqm | 382.99 ₹1,076.20 | 387.25 ₹1,088.17 |
| 10.00 | Provision for Sign board 60cm size including all charges etc complete | 2 | Nos | 4,995 ₹9,990 | 5,050.49 ₹10,100.98 |
Updated dates
Tender Value
₹20.7 L
EMD Value
₹21,000
Closing Date
16 Feb 2026, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri Dt Bargur Block RRMS 2025_26 Renewal The BT Road From Elathagiri Varattanapalli Road to Madhanakuppam Via Ramnagar Valayalkaran Kottai at palepalli Panchayat BRG_72
2026_RDTN_652184_1
5309_2025_R3_dt_04_.02_2026
Open Tender
Civil Works - Others
180 days
The Block Development Officer
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹21,000
The Block Development Officer
18 Mar 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
9 Feb 2026
1. Renewal the BT Road From Elathagiri – Varattanapalli Road to Madhanakuppam Via Ramnagar Valayalkarankottai KM 0/0-1/2 H/O Palepalli
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Road marking with hot applied Themoplastic compound with Reflectorining glass beads in Bituminous surface
Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete
Provision for Sign board 60cm size including all charges etc complete
Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete
Provision for Name board
Provision for Photo charges
Provision for KM stone
Provision for HM stone
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.06 MB
PB_TB_72.pdf
Tender Documents • 0.93 MB
BOQ_782038.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid