| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.5 LAccepted-AOC | ₹48.5 L | L1 | Accepted-AOC Addmited |
| 2 | L2₹48.6 LRejected-AOC K K M TOWER KANDHIKUPPAM POST BARGUR TALUK KRISHNAGIRI DISTRICT 635 108 | KRISHNAGIRI | TAMIL NADU | 635108 | ₹48.6 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | KKM Construction L2 | Kannaiyan Contractor L1 |
|---|---|---|---|---|---|
| 1.00.Infrastructure Development Works at Ambedkar Colony and Burial Ground H/Okandhikuppam AD Colony SC Ward Code: KGI25RUR054. Rs-49.126 Lakhs | |||||
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart | 46.24 | Cum | 264.15 ₹12,214.30 | 263.65 ₹12,191.18 |
| 3.00 | Second Depth | 8.06 | Cum | 264.15 ₹2,129.05 | 263.65 ₹2,125.02 |
| 4.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.45 | Cum | 1,692.16 ₹4,145.79 | 1,688.95 ₹4,137.93 |
| 5.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers. | 2.77 | Cum | 5,288.54 ₹14,649.26 | 5,278.51 ₹14,621.47 |
| 6.00 | RCC in M30 GRADE using graded aggregates of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers 1.5m to 4.5m | 7.59 | Cum | 9,154.42 ₹69,482.05 | 9,137.05 ₹69,350.21 |
| 7.00 | For items 0 to 1.50m below GL | 1.75 | Mt | 9,015.45 ₹15,777.04 | 8,998.35 ₹15,747.11 |
| 8.00 | For items 0m to 4.5m above GL | 2.83 | Sqm | 9,156.72 ₹25,913.52 | 9,139.35 ₹25,864.36 |
| 9.00 | For items 4.51m to 7.32m above GL | 2.23 | Sqm | 9,435 ₹21,040.05 | 9,417.1 ₹21,000.13 |
| 10.00 | For items 7.32m to 10.98m above GL | 2.53 | Sqm | 9,713.28 ₹24,574.60 | 9,694.85 ₹24,527.97 |
Tender Value
₹4.9 Cr
EMD Value
₹50,000
Closing Date
5 Feb 2026, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri DT Bargur Block SADP 2025_26 Infrastructure Development Works at Ambedkar Colony and Burial Ground at kandhikuppam AD Colony SC Ward Code_ KGI25RUR054 BRG_71
2026_RDTN_650125_1
96_2025_dt_09_12_2025
Open Tender
Civil Works - Others
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹50,000
12 Mar 2026
2 Feb 2026
5 Feb 2026
2 Feb 2026
5 Feb 2026
2 Feb 2026
.Infrastructure Development Works at Ambedkar Colony and Burial Ground H/Okandhikuppam AD Colony SC Ward Code: KGI25RUR054. Rs-49.126 Lakhs
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Departmental officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney eart
Second Depth
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Departmental officers.
RCC in M30 GRADE using graded aggregates of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by Departmental officers 1.5m to 4.5m
For items 0 to 1.50m below GL
For items 0m to 4.5m above GL
For items 4.51m to 7.32m above GL
For items 7.32m to 10.98m above GL
For items 10.98m to 14.64m above GL
For items above 14.64m & up to 18.30m from GL
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffened with welded MS angles of size 25mm x 25mm x3mm of boarding
PLANE SURFACES Below GL
ABOVE G.L. to 3.30m
Curved Surface 0 to 3.30m from floor level
Square column Below G.L.
Ground level to 3.30 m
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by Departmental officers.
Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm c
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by Departmental officers
Providing cut stone slab in CM 1:3 and as directed by Departmental officers
Providing Hand rails over the Roof slab by using 32 mm GI Pipe with 40mm x 6mm MS Flat and fixed with 12mm die Fastener Bolt 75mm long and as directed by Departmental officers
CI man hole cover
65mm Ø GI pipes for over flow & 1xl
65mm Ø GI pipes for over flow & 1xl
50mm Ø GI pipes for scour pipe 1xl
65mm Ø GI pipe for delivery 1x1 pipe
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 90degree Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer medium
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
50mm Ø GI coupler
Refilling the foundation with excavated earth including consolidation as directed by the Departmental officers.
Provision for Soak pit as per sub estimate
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
75mm PVC Elbow
75mm PVC Tee
75mm PVC End Cap
75 mmPVC Ball Valve
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick
Towards supply, cost, laying of GI/ PVC pipes & specials And Electrical items including all cost and conveyance etc., all complete
Towards cost for laying of PVC pipes including all cost and conveyance etc., all complete
63mm PVC Elbow
63mm PVC Tee
63mm PVC End Cap
63mmPVC Ball Valve
Provision for chlorinator as per sub estimate
CONSTRUCTION OF WAITING SHED AT AMBEDKAR COLONY BURIAL GROUND H/O Kandhikuppam.
Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth
Collection and Supply of sand filling into the basement Including cost and conveyance to the site and all labour charges
Refilling in foundation and basement with excavated earth in layer of not more than 15cm thick Including cost and conveyance to the site and all labour charges
Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Cement mortar 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum
Brick work in CM 1:5 mix using New Country Bricks including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
CENTERING BELOW GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CENTERING ABOVE GL: Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering in CM 1:5 mix using 12mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Weathering Course with Brick jelly lime concrete 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Pressed tiles with Brick jelly lime concrete 20mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Granolethic floor finish in CM 1:2:4 mix using 10-12m thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Painting Two Coat of New Plastered wall surface with ready mixed plastic emulsion including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
BT Road
Clearing and grubbing (Scrub jungle) road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceab
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for Road marking with hot applied Themoplastic compound with Reflectorining glass beads in Bituminous surface
Provision for Rumble strip with Reflectorining glass beads in Bituminous surface ( Speed barker) including all charges etc complete
Provision for Sign board 60cm size including all charges etc complete
Provision for HM Stone
Provission for Citizen board & Name board
Construction of Compound Wall
Earth work excavating and depositing on bank with initial lead of 10mt and lift of 2mt in hard stiff clay ,stiff black cotton,hard red .earth,shales,murrum, gravel, stoney earth and earth mixed with small size boulders as per ss 20 B.
Cement concrete 1:4:8 (one cement, four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B) - 10.00 Sqm.
Wearing Coat
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
Supplying and Fixing of Bitumen pad including all charges and all labour charges etc complete.
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Construction of Drinage
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks
Supplying and fabricating and placing in position MS or RTS reinforcement works
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_779472.xls
BOQ • 0.41 MB
PB_99.pdf
Tender Documents • 0.60 MB
TB_99.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid