| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹54.8 L+₹2.3 L (4.36%)Rejected-Finance 1546 2ND FLOOR CHURCH ROAD KASHMERE GATE DELHI DELHI DELHI 110041 | WEST DELHI | DELHI | 110041 | L2 | Rejected-Finance L2 | |
| 3 | L3₹55.1 L+₹2.6 L (4.99%)Rejected-Finance B 184 SECOND FLOOR GUPTA JI PLAZA NHPC CHOWK FARIDABAD HARYANA 121010 FARIDABAD HARYANA 121010 | FARIDABAD | HARYANA | 121010 | L3 | Rejected-Finance L3 | |
| 4 | L4₹59.7 L+₹7.2 L (13.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹60.7 L+₹8.2 L (15.6%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
9 Nov 2020, 6:00 pmClosed
Asstt. GM (Engg.-E)
AAI, LGBI Airport, Guwahati
100KLD Sewage Treatment Plant (STP) based on MBBR Treatment at LGBI Airport, Guwahati - Electrical and Mechanical works
2020_AAI_60051_1
AAI/AGM(E-E)/NIT-09/2020-21
Open Tender
Electrical Works
Item Rate
180 days
LGBI Airport, Guwahati
As per NIT Criteria
13 documents required · 13 mandatory
₹1,120
AIRPORTS AUTHORITY OF INDIA
₹1.4 L
8 Jul 2021
17 Oct 2020
12 Nov 2020
17 Oct 2020
9 Nov 2020
17 Oct 2020
17 Oct 2020 - 28 Oct 2020
Amount
SEWAGE TREATMENT PLANT (MBBR TECHNOLOGY) Design, supplying, installing, testing & commissioning of Sewage Treatment Plant (excluding excavation, back filling & disposal of surplus earth MS/Civil construction work) for the following duty: Nature of effluent - Domestic Sewage from toilet, kitchen waste water shall be discharged into the STP. Design to take consideration of same. Daily average flow - 100 Cum / Day pH - 7.5 – 8.5 BOD5 - 250 – 450 Mg/L S. Solids - 200 – 400 Mg/L COD - 600 – 800 Mg/L Oil & Grease - 50 Mg / L Effluent discharge standard after treatment pH - 6.0 – 8.5 BOD5 - Less than 20Mg/L S. Solids - Less than 10 Mg/L COD - Less than 60 Mg/L Oil & Grease - Less than 5 Mg / L Sewage treatment plant shall include the following items: Screen Chamber Sewage equalization tank/sump MBBR Reactor Secondary Settling Tank Chlorine Contact Tank Sludge Holding Tan Filtration through MGF & ACF Air Blowers, Pumps & equipment Piping, valves etc Electrical Panel & Cabling Quoted rate should include Approval from pollution board at initial & various other stages of works including preparation of report/ drawings as per pollution board requirement, arrangement of raw sewage for testing & commissioning. Contractor shall include the cost of all chemicals (consumed during testing & commissioning and the cost of such items of works which are not explicitly mentioned above, but are mendatory to have pollution board approval.
Supply, Installation, Testing and Commissioning of Stainless Steel Perforated, Corrugated Bar Screen with manual lifting arrangement.
Supply of MS hot dip galvanized puddle flanges in accordance to BS:10 table D as required to be provided (in the structural slab and wall) of various diameters. Puddle flanges shall be provided for all the structural component of the STP. The installation of the puddle flanges shall be carried out by the Civil contractor in accordance to the Civil GA drawing (to be prepared by the STP contractor) at the required levels & position; under the supervision of the STP contractor.
Supply of plastic manhole step/foot rest (@ 300 mm c/c) with polypropelene compound injection molded around 12 mm dia (Fe-415) steel reinforcing bar. Provision of the foot rest is envisaged in various tanks/ components of the STP for the purpose of accessability. The installation of the foot rest shall be done by the civil contractor as per civil GA drawing.
Supply, installation, testing & commissioning of electronic type Auto Water Level Controller indicator and controller for automatic operation of the system with high/low level alarm complete with auxillary NO/NC contacts for each tank.
Supply, installation, testing & commissioning of non clogging type pumps capable of handling solids upto 35mm having SS casing & SS impeller complete with all accessories, motor of required capacity. Delivery header with isolation valve, pressure gauge on delivery line with isolation cock, level controller (with wiring) to control the level of sump automatically. Pumps shall have following duty:
Supply, Installation, Testing and Commissioning of Submersible Sewage lifting pump (from Septic Tank to Equalization Tank) Capacity- 1HP, 0.75KW, Flow Rate- 2m3/hr Head- 8-10m
Supply, Installation, Testing and Commissioning of Submersible Sewage lifting pump (from Equalization Tank to MBBR Tank) Capacity- 2HP, 1.5KW Flow Rate- 5-6m3/hr Head- 8-10m
Supply, Installation, Testing and Commissioning of Sludge pump (from Clarifier Tank to Sludge Sump) Capacity- 1HP, 0.75KW Flow Rate- 5- m3/hr Head- 3-4m Cost shall be inclusive of PVC flexible Hose pipe ( for piping submeged in effluent) with MS epoxy piping (for piping non-submerged in effluent). Provision of guide ropes to guide submersible pump from upper level to operational level in sump basin with channels / angle section of MSEP shall be made by the STP contractor.
Air diffusion system shall include the following:
Supply, Installation, Testing and Commissioning of twin type rotary air blowers (1W + 1S) capable of delivering 287 cum/hr of free air at 0.45 kg/cm2 driven through “V” belt or directly coupled through flexible coupling to a TEF Cmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply. (for MBBR Tanks)
Supply, Installation, Testing and Commissioning of twin type rotary air blowers (1W + 1S) capable of delivering 215 cum/hr of free air at 0.45 kg/cm2 driven through “V” belt or directly coupled through flexible coupling to a TEF Cmotor of suitable HP Suitable for 415 ± 10% volts, 3 phase, 50 cycles A/C supply. (for Equalization Tank)
Air piping shall comprise of pipes droppers/ laterals with MS (epoxy coated) Header complete with all fittings such as tees, crosses, plugs, sockets, elbows, reducers, supports & clamps, puddle flanges etc cutting chases & making good. Contactor to submit detailed P & I indicating their proposal.
Supply, Installation, Testing and Commissioning of Fine Bubble Diffusers, Dimensions: 63mm dia. x 1000mm long, EPDM Membrane Type, Air Flow Rate: 3m3/hr- 9m3/hr (Optimal 2m3/hr - 5m3/hr)
Bronze Ball valve and air dispersion grid as required for STP as described above.
Providing and fixing all piping (as described below) and isolation control valves for making the system complete. SS 304 : Submerged air piping MS Epoxy : Air piping & pumped effluent riser (non-submerged) PVC piping : Pumped effluent (submerged) & tank overflow pipe line GI (Heavy) : Interconnecting pipe line after delivery header of pump/ filter
Supply, installation, testing and commissioning of FAB (MBBR) Media, High Strength Hollow Fiber, Pore Size- 0.6micron
Supply, installation, testing and commissioning of PVC tube deck settling media to be installed in Clarifier Tank, V-Type Media, Settling Velocity- 0.5m/s
Supply, installation, testing & commissioning of Chlorine dosing system comprising of 200 ltrs HDPE / FRP tank with 0-12 lph electronic metering type pump.
Supplying, installing, testing & commissioning of horizontal centrifugal filter feed water pumps CI Head & Base, Bronze Impeller along with motor, pressure gauge with isolation cock, Isolation valve, NRV on delivery line. Isolation valve, stainer (with by-pass) at suction. Mechanical seal, suitable vibration elimination pads of approved design, drain pipe with valve (25 dia) for the pump. The pump shall be suitable for 415±10% volts 3 phase AC supply. (1 Working + 1 Standby)
Supply, Installation, Testing and Commissioning of Centrifugal Filter Feed pump (from Chlorination Tank to MGF) Capacity- 1.5HP, 1.12KW Flow Rate- 5-6m3/hr Head- 3-4m
Providing, fixing, testing & commissioning of vertical FRP filter with adequate dirt holding capacity. Fabricated from FRP as per manufacturer's specifications complete with initial charge filter media including painting Including concrete foundation with cement plaster complete as required. The filter shall also be provided with set of internals for raw water inlet and bottom collecting system. Complete with frontal piping (heavy) and butterfly valves designed on 1.50 m / sec velocity.
Multigrade Filter Filtration Rate 5000-6000L/Sqm/Hr Capacity : 1.4-1.7 LPS each
Activated Carbon Filter Filtration Rate 5000-6000L/Sqm/Hr Capacity : 1.4-1.7 LPS each
Providing and laying GI pipes (heavy class) (Tertiary Treatment Equipment Piping) of approved make conforming to IS:1239-1982 complete with GI fittings such as tees, crosses, plugs, sockets, elbows, reducers, unions, flanges, sleeve pieces, check nuts etc in including cutting and making good the walls, floors, RCC work etc cutting chases & filling the same with cement concrete 1:3:6 (1cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size) or cement mortar 1:4 (1 cement:4 coarse sand) as required, including painting the exposed pipes with desired shade of enamel paint over a coat of primer.
50 mm dia
Providing and fixing cast iron butterfly valves tested to 15 kg/ Sqcm pressure (Including flanges).
50 mm dia
Providing and fixing horizontal flap type non-return valve tested to 15 kg/Sqcm pressure of approved make (including flanges)
50 mm dia
Supply, installation, testing and commissioning of Magnetic flow meter suitable capacity with preamplifier and microprocessor including necessary cabling, conduit, etc. complete suitable for raw sewage application.
Supply, installation, testing & commissioning of Filter Press; MS Structure, P.P. Recessed Plate Type, Vertical 470mm x 470mm x 18 Chambers, along with 2nos. of 1HP Screw Pump for feeding of the Sludge (1 W + 1 Standby)
Annual Operation, upkeeing and maintenance of all equipments, machineries and accessories related to 100KLD Sewage Treatment Plant involving operation minor condition of the system, ensuring serviceability / satisfactory working condition of the system, maintenance of records / documentation of the above works etc., as per the detailed specification, terms & conditions covered under this contract on all days including Sundays & holidays of the month complete as required. The required minimum man power (One Technician cum Operator and One Helper in each shift for round the clock operation and One sweeper in General shift) to be deployed for each shift of 8 hrs for the equipments to be operated and upkeeped shall be as per Technical specification and special condition of contract. Required spares and chemicals shall be issued by department as per site requirement.
During DLP
First Year
Second Year
HITECH ENVIRO ENGINEERS AND CONSULTANTS PVT LTD
ENHANCE ECOTECH SOLUTION PVT LTD
GREENTECH ENTERPRISE
B S ENVIRO N INFRACON PVT LTD
Oxybee Solutions
PRIORA WATER SOLUTIONS PVT LTD
CLEAR ION EXPERTS PVT LTD
SHREE BHARAT ION EXCHANGE ENGINEERS
Sarvo Technologies Limited
SAWEN CONSULTANCY SERVICES PVT. LTD.
M/S EASTERN ENVO PROTECT
Advance Equipment And Projects Pvt Ltd
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .