| 1 | 1₹8.4 LAccepted-AOC INDER NAGER NEW KHNEELLI ROAD NEAR IDTER OFFICE ROHTAK INDER NAGAR NEW KHANELLI ROAD ROHTAK 124001 | ROHTAK | HARYANA | 124001 | 1 | Accepted-AOC accept | |
| 2 | 2₹9.1 L+₹73,007 (8.69%)Rejected-AOC | 2 | Rejected-AOC reject |
Tender Value
₹8.6 L
EMD Value
₹17,100
Closing Date
24 Mar 2022, 3:00 pmClosed
Executive Engineer
Sampla W/S Division, Rohtak
Constructing sump well at RD 42700-L and 46500-R of Dulhera Disty.
2022_HRY_211529_5
2012-37/12-A
Open Tender
Civil Works
Item-rate/Agreement basic
90 days
Rohtak
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹17,100
Yes
13 Apr 2022
10 Mar 2022
25 Mar 2022
10 Mar 2022
24 Mar 2022
10 Mar 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge All kinds of soil (HSR Item No. 4.12 ).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1:3:6 (1 Cement : 3 coarse sand (zone-Ill): 6 graded cum stone aggregate 40 mm nominal size) (HSR Item No. 6.1.5)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 : 1 ½: 3 ( 1 Cement: 1 ½ coarse sand (zone-Ill) : 3 cum graded stone aggregate 20 mm nominal size) (HSR Item No. 6.1.1)
Brick Masonry Work in Cement Mortar 1 :3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications MORT&H clause 1300) Cement Mortar 1 :3 (1 cement : 3 sand) (HSR Item No. 15.6.1)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement-All work up to plinth level:1 : 1. 5: 3 ( 1 cement : 1. 5 coarse sand (zone-Ill): 3 cum graded stone aggregate 20 mm nominal size) (HSR Item No. 6.14.1)
10 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand) (HSR Item No. 11.5.3)
Pointing on brick work or brick flooring with cement mortar 1 :3 (1 cement : 3 fine sand): Flush / Ruled/ Struck or weathered pointing (HSR Item No. 11.25.1)
Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns:(HSR Item No.6.29.1)
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (HSR Item No. 13.28)
Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Cold twisted bars (HSR Item No. 6.33.3)
THE BHANWATI DEVI CO-OP L&C SOCIETY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .