| Sl No | Description | Qty | Unit | Hayagreeva Earth Movers L2 | T Vaithy L1 |
|---|---|---|---|---|---|
| 1.00Construction of Drain with CC lane | |||||
| 1.10 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thi | 80 | m3 | 118 ₹9,440 | 115 ₹9,200 Lowest |
| 1.20 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per sta | 38 | m3 | 5,742 ₹2,18,196 | 5,620 ₹2,13,560 Lowest |
| 1.30Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.40 | a) Drain works up to 1m Height | 180 | m2 | 560 ₹1,00,800 | 548 ₹98,640 Lowest |
| 1.50 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 48 | m3 | 7,160 ₹3,43,680 | 7,008 ₹3,36,384 Lowest |
| 1.60 | Plastering with cement mortar 1:3mix, 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications | 24 | m2 | 637 ₹15,288 | 623 ₹14,952 Lowest |
| 1.70 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 32 | m3 | 69 ₹2,208 | 68 ₹2,176 Lowest |
| 1.80 | Provisions Bitumen Pad 20mm thick for Expansion Joints etc, complete. | 11 | m2 | 734 ₹8,074 | 718 ₹7,898 Lowest |
Tender Value
₹8.2 L
EMD Value
₹8,200
Closing Date
6 Feb 2026, 3:00 pmClosed
THE COMMISSIONER, SALEM CITY MUNICIPAL CORPORATION
Salem City Municipal Corporation, Fort Main Road, Salem
Construction of Drain and Providing CC Pavement at Kuppaimedu main road Cross lane (Annai School lane) in Division No.43 of Ammapet Ward Office.
2026_MAWS_649347_1
E8-Est No-213-D-2025-2026
Open Tender
Civil Works
Lump-sum
60 days
Salem City Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,200
9 Jul 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
6 Feb 2026
31 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Drain with CC lane | |||||
| 1.1 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thi | 80 | m3 | - | - |
| 1.2 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per sta | 38 | m3 | - | - |
| 1.3 | Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over (silver oak joists) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | - | - | - | - |
| 1.4 | a) Drain works up to 1m Height | 180 | m2 | - | - |
| 1.5 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 48 | m3 | - | - |
| 1.6 | Plastering with cement mortar 1:3mix, 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications | 24 | m2 | - | - |
| 1.7 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 32 | m3 | - | - |
| 1.8 | Provisions Bitumen Pad 20mm thick for Expansion Joints etc, complete. | 11 | m2 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_778479.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .