Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC lowest amount quoted for tender |
| 2 | L2₹2.8 LRejected-Finance | ₹2.8 L | L2 | Rejected-Finance highest amount quoted |
| Sl No | Description | Qty | Unit | BAHIRATHAN L2 | S BHARATHKUMAR L1 |
|---|---|---|---|---|---|
| 1.00Part.01. Maintenance of Veerakken-Koothanur Road @ Veerakken -Panchayat km:0/0-1/100. | |||||
| 2.00Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | |||||
| 3.00 | km:0/0-1/100 | 24 | Sq.m | 7 ₹168 | 6 ₹144 |
| 4.00Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | |||||
| 5.00 | km:0/0-1/100 | 500 | Cu.m | 145 ₹72,500 | 140 ₹70,000 |
| 6.00Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site | |||||
| 7.00 | km:0/0-1/100 | 187.5 | Cu.m | 3,286 ₹6.2 L | 3,285 ₹6.2 L |
| 8.00Providing and laying Tack coat over BT surface using 3Kg of Emulsion 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | |||||
| 9.00 | km:0/0-1/100 | 1,500 | Sq.m | 35 ₹52,500 | 33.1 ₹49,650 |
| 10.00Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | |||||
Tender Value
₹2.8 L
EMD Value
₹2,750
Closing Date
24 Oct 2025, 3:00 pmClosed
Block Development Officer (BP),Thiruppanandal,
Block Development Officer (BP),Thiruppanandal,
Maintenance of Veerakkan to Koothanur Road at Veerakkan pt in Thiruppanandal Block under RRMS 2025 2026 Tranche.
2025_RDTN_615421_1
Rc.No. 1612/2025/A2 dated 13.10.2025
Open Tender
Maintenance Works
90 days
Panchayat Union Office, Thiruppanandal
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹2,750
Yes
3 Jan 2026
17 Oct 2025
24 Oct 2025
17 Oct 2025
24 Oct 2025
17 Oct 2025
Amount
Part.01. Maintenance of Veerakken-Koothanur Road @ Veerakken -Panchayat km:0/0-1/100.
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site
Providing and laying Tack coat over BT surface using 3Kg of Emulsion 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for HM Stone
Provision for KM Stone
Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
BAHIRATHAN (BID ID -1495145)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
pricebid.pdf
Tender Documents • 0.61 MB
technicalbid.pdf
Tender Documents • 0.80 MB
BOQ_735300.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid