Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC | ₹1.0 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹1.0 Cr+₹18,758.92 (0.18%)Rejected-AOC KARUR | ₹1.0 Cr+₹18,758.92 (0.18%) | L2 | Rejected-AOC Rejected |
Tender Value
₹1.0 Cr
EMD Value
₹1.1 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Project Director DRDA Krishnagiri
DRDA Krishnagiri
Krishnagiri DT NABARD XXXI 2025-26 Bargur Block Strengthening of the road from Batlapalli x road to Ampalli road Km 3.0 to 4.0 Guttur panchayat R-656 Package No.TN-04-KRI-152
2025_RDTN_571667_1
Roc_1985_2025_R3_Date_28_05_25
Open Tender
Civil Works - Roads
Item Rate
180 days
Bargur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.1 L
DRDA Krishnagiri
5 Aug 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
25 Jun 2025
20 Jun 2025
21 Jun 2025
Amount
Strengthening of the road from Batlapalli X road to Ampalli Km 3/0- 4/0 H/o. Guttur. Road Code R-656
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10m and lift of 2m including all labour charges and incidential charges such as shoring, strutting, procviding coffer dams, bailing out
Picking 5cm to 10cm Old Metalled Surface and Sectioning -1 Sqm
Providing and Laying Gravel to 100mm Compacted thick including cost & conveyance of Gravel From Approved sources to work site including labour for Spreading, watering and comp-acting by power roller to achieve the required proctor density at 100 % compaction.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @65%, 4.75 to 2.36 mm IRC HBG metal @ 20 % & 2.36 mm below IRC HBG metal @ 15 %) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6 % respectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Plant Mix method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WBM/WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat WMM Surface (treated with primer) at 2.5 KG of RS-1 Bitumen Emulsion / 10 Sqm including labour for spraying, hire charges for bitumen sprayer etc., comp
Providing laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50-13.20 mm, 0.43 cum of 13.20 -2.36mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30 ton capcity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 m with mechanical paver to the specified grades abd cross sections and consolidated by 8-10 ton Vibratory Roller to ther required density etc., including labiour for attending to paver to site etc., including hire abd fuel charges for 20-30t CMP with bitumen boiler, tipper, trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rey-5
BITUMINOUS CONCRETE 25MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Provision of 15 nos. rumble strips covered with premium bituminous carpet, 15-20mm high at centre at approved locations to control speed, marked with white strips of road marking paint
Rumble Strip Ch 3940
Provision for Sign Board
Provision of KM Stone
Provision of HM Stone
Metal crash Barrier
Maintenance
For 1st year maintenance
For 2nd year maintenance
For 3rd year maintenance
For 4th year maintenance
For 5th year maintenance
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
SPE Construction (BID ID -1379584)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .