Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.1 L+₹11,196.50 (5.49%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.2 L+₹19,011.66 (9.33%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.2 L+₹20,086.52 (9.86%)Admitted-Finance | L4 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹22,393
Closing Date
11 Aug 2026, 3:00 pmClosed
chief engineer
chief engineer
Construction of CC roads and nali from taseel showroom house to hak trailor for lakhi gate second at ward no. 70
2026_NNSAH_1169725_1
6285 B
Open Tender
Civil Works
Percentage
30 days
saharanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹22,393
24 Sept 2026
23 Jul 2026
12 Aug 2026
23 Jul 2026
11 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Of old CC or Brick or granolithic floors including base concrete and including stacking of dismantled material as directed by the Engineer -in-charge with in a distance of 60 metre(200 Feet) S.No 697
Mahes wali gali
Ajay wali gali
Praveen se Barat Ghar
Dinesh wali gali
Dinesh ke makan se Sarkari toilete tak | 59.21 | sqm | 38 | ₹2,249.98 |
| 2 | Dismantling Brick Work or stone work in lime or cement mortar and including stacking of materials as Directed by the Engineer-in-charge with in a distance of 60 meter(200feet)
Nali wall Side
Nali Road Side | 4.08 | cum | 400 | ₹1,632 |
| 3 | Deduction cost of old brick (SOR UP PWD Supply SI - 1F) | 1,219.92 | No | 5.8 | ₹7,075.54 |
| 4 | Deduction cost of old brick bat (SOR UP PWD Supply SI - 1F) | 1.43 | cum | 800 | ₹1,144 |
| 5 | Disposal of Excavated Soil up to 5.00 KM distance complete with labour T&P ETC at site. (SOR UP PWD SI - 131(A)
100% Disposal of Excavated Material (Average Diatance from all Sides of City)
80 % Of Excavated Material | 4.74 | cum | 130 | ₹616.2 |
| 6 | Earth work in filling upto 8 km distance frome site including loading unloading cartage etc complete (anallises Rate) | 15.54 | cum | 255 | ₹3,962.7 |
| 7 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 273)
Under Nali Both Side | 5.32 | cum | 2,985 | ₹15,880.2 |
| 8 | Cement Concrete in proportion of 8:4:1 with 4cm guage approved stone ballast, Coarse sand & cement in the materials, labour Tools & plants etc. required for proper completion of the work. (SOR UP PWD SI - 279)
As per Item No (B) | 5.92 | cum | 4,850 | ₹28,712 |
| 9 | M-150 Brick work in 1:4 one cement and four course sand, mortar in foundation in plinth including suopply of all material labour, T &P etc. required for proper completion of the work. (SOR UP PWD - 305A)
Wall Side Nali
Road Side Nali | 11.6 | cum | 4,690 | ₹54,404 |
| 10 | 12 mm thick plaster with cement and approved fine sand mortar in 1:4 over brick work minium thickness not to be less than 1 Cm including supply of all material labour Tool & Plants etc. required for proper completion of the work. (SOR UP PWD SI - 584) | 63.79 | sqm | 165 | ₹10,525.35 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.42 MB
BOQ_2195242.xls
BOQ • 0.24 MB
nit40.pdf
PDF • 5.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .