| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAdmitted-Finance 71 BALU BANKER COLONY P O DHORI 825102 JHARKHAND | BOKARO | JHARKHAND | 825102 | ₹21.7 L | L1 | Admitted-Finance |
| 2 | L2₹22.0 L+₹30,680 (1.41%)Admitted-Finance | ₹22.0 L+₹30,680 (1.41%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | - | - | Rejected-Technical Not relevant as per requirement of NIT. |
| Sl No | Description | Qty | Unit | M/S NATIONAL ELECTRICAL WORKS L1 | M/S SHREE TIRUPATI TRADERS L2 |
|---|---|---|---|---|---|
| .01PART A: Mechanical repairing of 115KW, 150HP, 1440RPM, NFLP Crompton greaves make for water supply installed at IWSS river side of CCD, GM unit. | |||||
| .02 | Repairing and setting of Both side terminal box and new making of its cover by iron sheet. | 1 | job. | 10,000 ₹10,000 Lowest | 10,500 ₹10,500 |
| .03 | Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge. | 1 | job. | 20,000 ₹20,000 Lowest | 21,000 ₹21,000 |
| .04 | cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material. | 1 | no. | 23,000 ₹23,000 Lowest | 23,000 ₹23,000 Lowest |
| .05 | Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc. | 1 | job. | 28,000 ₹28,000 Lowest | 28,000 ₹28,000 Lowest |
| .06 | End cover housing repairing by Cl electrode welding and machining as per bearing size. | 1 | nos. | 17,500 ₹17,500 Lowest | 18,000 ₹18,000 |
| .07 | Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor. | 48 | nos. | 500 ₹24,000 Lowest | 500 ₹24,000 Lowest |
| .08 | After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots. | 48 | nos. | 1,200 ₹57,600 Lowest | 1,200 ₹57,600 Lowest |
| .09 | Supervision , incidental & overhead expenses | 1 | job. | 27,015 ₹27,015 Lowest | 27,015 ₹27,015 Lowest |
| .10PART B: Mechanical repairing of 125KW, 170HP, 1440RPM, NFLP Kirloskar make for water supply installed at IWSS river side of CCD, GM unit DA. | |||||
Tender Value
Refer Docs
EMD Value
₹25,900
Closing Date
10 Aug 2026, 9:00 amClosed
STAFF OFFICER EnM
STAFF OFFICER EnM Dhori Area
Repairing of 10 nos induction motor( 1nos , 115 KW , 3 nos 90 KW , 3 nos 125 KW and 3 nos 65KW ) NFLP , 440V , 1440RPM of different make for water supply purpose installed at IWSS river side under CCD of Dhori Area.
2026_CCL_362654_1
GM(D)/SO(EnM)/NIT/2026-27/18 dtd- 27.07.2026
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
CCD
Please refer tender documents
2 documents required · 2 mandatory
₹25,900
29 Aug 2026
28 Jul 2026
11 Aug 2026
29 Jul 2026
10 Aug 2026
29 Jul 2026
29 Jul 2026 - 3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | PART A: Mechanical repairing of 115KW, 150HP, 1440RPM, NFLP Crompton greaves make for water supply installed at IWSS river side of CCD, GM unit. | - | - | - | - |
| 0.02 | Repairing and setting of Both side terminal box and new making of its cover by iron sheet. | 1 | job. | - | - |
| 0.03 | Complete motor set dismantling, After repairing work its complete assembling/commissioning with testing checking charge. | 1 | job. | - | - |
| 0.04 | cooling fan new making as per sample with casting, machining, drilling tapping, new hub making & tightening with key ways cutting, alignment & balancing on lathe machine with material. | 1 | no. | - | - |
| 0.05 | Complete motor coil cleaning after cleaning its varnishing/heating, tapping etc. | 1 | job. | - | - |
| 0.06 | End cover housing repairing by Cl electrode welding and machining as per bearing size. | 1 | nos. | - | - |
| 0.07 | Gas heating and cutting grinding etc. Work of both end connection points, strip bars for old damage bar dismantling from rotor. | 48 | nos. | - | - |
| 0.08 | After repairing and changing of strips bars complete new breezing of both end points by gas heading, silver rod breezing and copper bars shape making of rotor strips bar after this bars fixing in same slots. | 48 | nos. | - | - |
| 0.09 | Supervision , incidental & overhead expenses | 1 | job. | - | - |
| 0.1 | PART B: Mechanical repairing of 125KW, 170HP, 1440RPM, NFLP Kirloskar make for water supply installed at IWSS river side of CCD, GM unit DA. | - | - | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.21 MB
BOQ_375562.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .