Loading…
Loading…
Tender Value
₹5 L
EMD Value
₹15,000
Closing Date
27 Aug 2026, 6:00 pm3d left
DFO Kathua
Office of the Divisional Forest Officer Kathua
Const. of Fencing (4000 rft) with Sq. PCC Fence Posts and every pole in cement concrete with G.I Barbed wire fencing (5x2-strands) at 4/K Barwal Kotal of Block Budhi Kathua Forest Range of Kathua Forest Division for the year 2026-27 under CAMPA NPV
2026_FD_321795_1
44 of 2026-27
Open Tender
Civil Works
Percentage
45 days
as per nit
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
DFO Kathua
₹15,000
Yes
21 Aug 2026
21 Aug 2026
28 Aug 2026
21 Aug 2026
27 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. | 0.8 | Sq.m | 12.49 | ₹9.99 |
| 2 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | - | Cum | 479.3 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed | 1 | Cum | 4,826.5 | ₹4,821.67 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement: 2 coarse sand :4 graded stone aggregate 20 mm nominal size) Crushed | 1 | Cum | 6,591.25 | ₹6,584.66 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete | 0.6 | Sqm | 286.35 | ₹171.81 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | - | cum | 218.4 | - |
| 7 | Finishing walls with water proofing cement paint of required shade on new work (two or more coats applied @ 3.84 kg/10 sq.m) | 0.6 | Sq.m | 98.75 | ₹59.15 |
| 8 | Supply of precast cement conc. poles of size 75 mm x 75 0mm x1800 mm
(including Carriage) | - | Each | 270 | - |
| 9 | Erecting c.conc. Poles in position.Qty vide item no.7 | - | Each | 150 | - |
| 10 | Fencing with R C C post placed at required distance embedded in cement concrete blocks last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 Horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum) betwen the two posts fitted and fixed with G.I staples on woodern plugs or G.I binding wire tied to 6 mm bars nibs fixed while casting the post (cost of R.C.C posts, struts, earth work and concrete to be paid for seperately) Payment to be made per meter cost of total length of barbed wire used with G.I barbed wire | 0.2 | MTR | 12.45 | ₹2.48 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
BOQ_1076021.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].