Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.1 L+₹13,299.03 (6.86%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.3 L+₹37,317.18 (19.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹2.6 L+₹65,584.30 (33.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
18 Aug 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
C/O Drain repairment near H/O Mohd Yousuf Wani Gratbal Anchidora Anantnag
2026_PWDJK_319587_2
NIT 61 of RnB/Ang/2026-27/5168-77 Dt 04/08/26
Open Tender
Civil Works
Percentage
10 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Executiver Engineer rnB Division Anantnag
₹6,000
22 Aug 2026
6 Aug 2026
19 Aug 2026
6 Aug 2026
18 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/mechanically incl disposal of same lead 50 mtrs as per direction of Eic complete job 1:3:6 or richer mix | 19.82 | Cum | - | - |
| 2 | Engagement of Jcb for removal of RCC spun pipe | 1 | Hour | - | - |
| 3 | P/l dry stone soling duly hand packed & consolidated with hand rammers inc. all carriage complete job. | 4.21 | cum | - | - |
| 4 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials complete job. | 2.47 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job. | 12.74 | Cum | - | - |
| 6 | Cement concrete flooring 1:2:4 (Icement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50mm thick with 12.5 mm nominal size stone aggregate | 13.93 | sqm | - | - |
| 7 | Providing and laying in reinforced specified position cement concrete of (1:1.5:3 ) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials complete job. | 4.06 | Cum | - | - |
| 8 | Steel reinforcement for RCC work including Straightning , cutting , bending ,placing in position and binding all material TMT BARS FE 500 D OR MORE | 447.04 | kg | - | - |
| 9 | Centering shuttering incl removal of same for foundations and footings and bases of columns | 83.62 | sqM | - | - |
| 10 | Suspended Floors | 32.52 | sqM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1059104.xls
BOQ • 0.27 MB
CORRIGENDUMDATEii61Allitems.pdf
PDF • 0.15 MB
CORRIGENDUMDATE61Allitems.pdf
PDF • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .