| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.4 LAccepted-AOC | ₹45.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹45.5 LRejected-AOC | ₹45.5 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Ganesan L2 | K.Thankamani Contractor L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Piped Causeway Across River @ Periyapappanapalli H/O Chembarsanapalli.Est.Amt.Rs:-45.80 Lakhs | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. | 411.4 | Cum | 264.31 ₹1.1 L | 263.49 ₹1.1 L |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15.55 | cum | 1,841.43 ₹28,634.24 | 1,835.73 ₹28,545.60 |
| 4.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 156.24 | Cum | 5,491.86 ₹8.6 L | 5,474.87 ₹8.6 L |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 15.53 | Cum | 6,785.49 ₹1.1 L | 6,764.5 ₹1.1 L |
| 6.00 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) | 711.74 | sqm | 548.6 ₹3.9 L | 546.9 ₹3.9 L |
| 7.00 | Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height) | 314.22 | Cum | 5,762.4 ₹18.1 L | 5,744.57 ₹18.1 L |
| 8.00 | Supply and fixing of 900mm dia RCC NP3 pipes confirming to IS 458 of standard length including cost and conveyance of pipes to sites including labour charges for fixing in position to proper gradient and including cost of jointing materials etc., complete for level portion. | 50 | Rm | 6,675.52 ₹3.3 L | 6,654.87 ₹3.3 L |
| 9.00 | Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment | 50 | Rm | 326.35 ₹16,317.50 | 325.34 ₹16,267 |
| 10.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete, | 28.59 | Cum | 280.9 ₹8,030.93 | 280.03 ₹8,006.06 |
Tender Value
₹45.8 L
EMD Value
₹46,000
Closing Date
12 Feb 2026, 3:00 pmClosed
The Block Development Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2021_22 Construction of Piped Causeway Across River at Periyapappanapalli in Chembarsanapalli Panchayat Package No_2025_26_SGI_121
2026_RDTN_654933_1
Rocno_3342_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹46,000
Yes
The Block Development Office Shoolagiri
18 Mar 2026
11 Feb 2026
12 Feb 2026
11 Feb 2026
12 Feb 2026
11 Feb 2026
11 Feb 2026
1.Construction of Piped Causeway Across River @ Periyapappanapalli H/O Chembarsanapalli.Est.Amt.Rs:-45.80 Lakhs
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Cement Concrete 1:3:6 (One Cement, Three M.Sand and Six broken stone jelly) using 40mm size hard broken stone jelly for dummy columns, excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete. (Reinforced Cement Concrete 1:2:4 for slab to be extended upto top of splashing with pressed tiles and future extension rods to be embedded in CC 1:3:6 (One Cement, Three M.Sand and Six hard broken stone jelly). Dummy columns should be at least 1 metre height)
Supply and fixing of 900mm dia RCC NP3 pipes confirming to IS 458 of standard length including cost and conveyance of pipes to sites including labour charges for fixing in position to proper gradient and including cost of jointing materials etc., complete for level portion.
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse an
Supply and fixing of RCC guide post of size1.20 x0.20 x 0.20 m with reflective star stickers with tin M.s sheet with two side packing and top cover of 0.75 inches in RCC 1: 2: 4 Mix using 20 mm HBG ISS metal with 10 mm. dia bars as vertical with 8mm dia Stirrups including 8.25 inches x 4.25 feet mould with star shape of 5 inches and top projection by 0.75 inches x 3 inches including cost and conveyance of materials to worksite etc., complete.,
Provision For Cautionary Sign Board
Provision For Writing Name Board Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
TB121.pdf
Tender Documents • 0.72 MB
BOQ_785259.xls
BOQ • 0.39 MB
PB121.pdf
Tender Documents • 0.71 MB
Download all tender documents and submit your bid