Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical DIST GODDA | GODDA | JHARKHAND | 813206 | Admitted-Fee/PreQual/Technical |
Tender Value
₹55.3 L
EMD Value
₹1.1 L
Closing Date
13 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, MID, GODDA
EE, MID, GODDA
Construction of Approach P.C.C Road at New Bridge Village - Bhatta, G.P - Dhapra under Block - Basantrai, District - Godda
2026_WRD_120461_2
DMFT/MID/GODDA/F2-08/2026-27
Open Tender
Civil Works
Percentage
180 days
Block - Basantrai, Dist. - Godda
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹1.1 L
14 Nov 2026
30 Oct 2026
14 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubbish, Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area . as per specification and direction of E/I. 2.2 | 0.09 | Ha | 19,760.3 | ₹1,778.43 |
| 2 | Loosening, Leveling and compacting original ground supporting embankment, scraified to depth of 150mm mixed with water of OMC and them compacted by rolling as to achieve minimum dry density as given in table 300.1 and 300.2 for embankment construction as per technical specification clause 301.413.20 Case II | 129.38 | M³ | 62.3 | ₹8,060.37 |
| 3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300- 2 3.18 | 616.98 | M³ | 131.3 | ₹81,009.47 |
| 4 | Granular Sub-base with Well Graded Material (Table 400.1) By MIX in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specification Clause 401.(iii) For Grading I Material 4.1 B (i) | 129.38 | M³ | 1,437.6 | ₹1,85,996.69 |
| 5 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing 6.02 | 172.5 | M³ | 5,316.1 | ₹9,17,027.25 |
| 6 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. 3.13 (i) B | 54.03 | M³ | 55.8 | ₹3,014.87 |
| 7 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification 12.03 | 3.66 | M³ | 567.76 | ₹2,078 |
| 8 | Providing stone boulder soling in Foundation Trenches as per Drawing & Technical Specification 16.09 | 3.75 | M³ | 1,544.4 | ₹5,791.5 |
| 9 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.12.08 ACase II | 7.68 | M³ | 3,754.4 | ₹28,833.79 |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.Random rubble masonry (coursed/uncoursed). 12.07 (B) | 171.72 | M³ | 3,458.6 | ₹5,93,910.79 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
NIT.pdf
Tender Documents • 1.11 MB
BOQ_163025.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .