Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.5 L+₹1.8 L (12.5%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.3 L+₹5.6 L (38.1%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹25.4 L+₹10.7 L (72.7%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹17,600
Closing Date
21 Feb 2020, 3:00 pmClosed
DGM T
SRPL Chennai
ANNUAL MAINTENANCE CONTRACT FOR PACKAGE CASSETTE SPLIT ACs AT SRPL MANALI
2020_SRCHN_112463_1
SRP19TS076
Open Tender
Electrical Works
Works
365 days
Manali
Refer NIT
6 documents required · 6 mandatory
₹17,600
Yes
12 Jun 2020
1 Feb 2020
22 Feb 2020
1 Feb 2020
21 Feb 2020
1 Feb 2020
1 Feb 2020 - 6 Feb 2020
Amount
Package ACs service items
Pressure Testing, Leak arresting of 5.5TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circuit for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such that the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pressure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplied Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 11 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In-Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, current, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenance, all parts of the AC has to be monitored regularly and in case of non–functioning of any parts, the same has to be informed to Engineer-In-Charge. The Periodic preventive maintenance shall be carried out every Month. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within a month, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch of Package AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Pressure Testing, Leak arresting of 8.5TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circuit for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such that the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pressure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplied Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 17 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In-Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, current, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenance, all parts of the AC has to be monitored regularly and in case of non–functioning of any parts, the same has to be informed to Engineer-In-Charge. The Periodic preventive maintenance shall be carried out every Month. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within a month, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch of Package AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaft, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Removal of old fan motor in the Indoor Unit and fixing new motor
Removal, Rewinding of Blower Motor and fixing of Blower Motor
Package ACs supply items
Supply of R-22 Gas
Supply of Fan Motor for Outdoor units for 5.5TR
Supply of Indoor coil (5.5 TR x 2)
Supply of Outdoor unit assembly (5.5 TR )
Supply of Copper Pipe 7/8 Inch
Supply of Drier (5.5 TR)
Supply of Expansion Valve (5.5 TR)
Supply of Compressor (5.5 TR)
Supply of Belt
Supply of Blower bearing (5.5 TR)
Supply blower Shaft (5.5 TR)
Supply of Contactor
Supply of OLR
Supply of HPLP Trip switch
Supply of Pressure gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of Compound gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of PCB (5.5 TR)
Supply of Copper Pipe 1/2 Inch
Supply of Copper Pipe 5/8 Inch
Supply of Drier (8.5 TR)
Supply of Expansion Valve (8.5 TR)
Supply of Blower bearing ( 8.5TR)
Supply of PCB for 8.5 TR
Supply of Fan Motor /Outdoor 8.5TR units
Supply of Indoor coil (17 TR)
Supply of Outdoor unit assembly (8.5 TR)
Supply of Compressor (8.5 TR)
Supply of blower Shaft ( 8.5TR)
Split ACs Service item
Complete service of A/C including washing with water and detergent, filter cleaning, coil cleaning, electrical wires checking, replacement of components (if any), pressure checking, excluding cost of spares.(bi-monthly preventive maintenance & breakdown maintenance as and when required). The maintenance has to be carried out as per Scope of Work mentioned in the Special Conditions of Contract. Unit EA refers EACH complete servicing of AC
1.5T Split
2.0T Split / Cassette /Tower
Topping up of refrigerant gas R-22
1.5T Split
2.0T Split / Cassette /Tower
Rewinding and servicing of fan motor including cost of material
1.5T Split
2.0T Split / Cassette /Tower
Complete gas charging refrigirent gas R-22 for 1.5T Window AC/ 1.5T Split AC/ 2.0T Split/Cassette/Tower AC
Repair of PCB for Voltas / Blue Star / O-General make ACs (including indoor and outdoor units) for1.5 T Window, 1.5T Split, 2.0T Split/Tower /Cassette AC
Fitting of Thermostat
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Condenser fan blade
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Fan blower
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Fan motor
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Filter
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Wiring kit
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Starting relay for 1.5T/2T A
Fitting of Copper pipe (Extra) with ins
Fitting of 50+6 mfd capacitor
Fitting of 50+2 mfd capacitor
Fitting of 45mfd capacitor
Fitting of 100/120 capacitor
1.5T Split
2.0T Split / Cassette /Tower
Fitting of 2.5/4/5 mfd fan capacitor
Fitting of MCB(32A)
service portion for Replacement of defective compressor by new ISI mark compressor (reciprocating or rotary) of reputed company with one year guarantee including commissioning & testing for desired performance. (company sealed)
1.5T Split
2.0T Split / Cassette /Tower
Installation of new PCB for Voltas / Blue Star / O-General make ACs (including indoor and outdoor units) for1.5 T Window, 1.5T Split, 2.0T Split/Tower /Cassette AC
SUPPLY ITEMS REQUIRED FOR SPLIT AC Maintenance
Supply of Thermostat
1.5T Split
2.0T Split / Cassette /Tower
Supply of Wiring kit
1.5T Split
2.0T Split / Cassette /Tower
Supply of Filter
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Condenser fan blade
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Fan blower
1.5T Split
2.0T Split / Cassette /Tower
Fitting of Fan motor
1.5T Split
2.0T Split / Cassette /Tower
Supply of Replacement of defective compressor by new ISI mark compressor (reciprocating or rotary) of reputed company with one year guarantee including commissioning & testing for desired performance. (company sealed) for Replacement of defective compressor by new ISI mark compressor (reciprocating or rotary) of reputed company with one year guarantee including commissioning & testing for desired performance. (company sealed)
1.5T Split
2.0T Split / Cassette /Tower
Supply of Copper pipe (Extra) with insulation
Supply of 50+6 mfd capacitor
Supply of 50+2 mfd capacitor
Supply of 45mfd capacitor
Supply of 100/120 capacitor
1.5T Split
2.0T Split / Cassette /Tower
Supply of 2.5/4/5 mfd fan capacitor
Supply - of new PCB for Voltas / Blue Star / O-General make ACs (including indoor and outdoor units) for1.5 T Window, 1.5T Split, 2.0T Split/Tower /Cassette AC
Supply of Starting relay for 1.5T/2T AC
Supply of MCB(32A)
ABS AIRCON ENGINEERS PRIVATE LIMITED
GENIUS AIRCON PVT LTD
MOV TECH ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .