Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹70.1 LAccepted-AOC | ₹70.1 L | L1 | Accepted-AOC Stood L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical As per TC evaluation committee |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TC evaluation committee |
| 4 | Rejected-Technical A 20 SHIVANI COMPLEX VIDHYA VIHAR OPP BARKATULLAH HOSHANGABAD ROAD BHOPAL MADHYA PRADESH 462026 UDYAM MP 10 0013154 23AAECC2242H1Z6 R M MSME STATUS AS VERIFIED | BHOPAL | MADHYA PRADESH | 462026 | - | - | Rejected-Technical As per TC evaluation committee |
| 5 | Rejected-Technical 30 SK 1 COMPOUND LASUDIA MORI DEWAS NAKA NEAR MAHINDRA WORKSHOP INDORE MADHYA PRADESH 452010 | INDORE | MADHYA PRADESH | 452010 | - | - | Rejected-Technical As per TC evaluation committee |
| Sl No | Description | Qty | Unit | THE SUN FRP WORKS L1 |
|---|---|---|---|---|
| 1.00Work of Fibre reinforced polymer (FRP) epoxy based lining work (Thickness 4 mm) in Equalization tank (Guard pond with vinyl ester resin) along with plastering , repairing / reconstruction work in Effluent Treatment Plant at 2X600 Stage – I, SSTPP, MPPGCL, Distt. – Khandwa | ||||
| 1.01 | FRP Lining (Thickness 4 mm) in existing equalization tank with vinyl ester resin
(i) 02 Nos Guard Pond Size along with top of boundary wall: 1650 M2
(ii) 02 Receiver Tank Size along with top of boundary wall: 04 M2
Total Area for FRP Lining: - 1650+ 04 = 1654 M2 | 1,654 | Sq.mtr. | 3,540 ₹58,55,160 Lowest |
| 1.02 | Existing equalization tank – Repairing withreconstruction of bottom 100 mm thick RCC-M25
(i) 02 Nos Guard Pond Size –20x20x0.1(meter height) = 40x2= 80M3
(ii) 02 Receiver Tank Size & other side: - 5 M3
Total Area: - 80+05=85 M3 | 85 | mtr. cube | 3,540 ₹3,00,900 Lowest |
| 1.03 | (i). Re-plastering &plastering workof 02 Nos Guard PondTank size – 20x 20 x 5 meter (Height) = 800M2
(ii). Re-plastering & plastering work of 02 Nos Receiver Tank size –2 M2 | 802 | Sq.mtr. | 1,062 ₹8,51,724 Lowest |
Tender Value
₹71.5 L
EMD Value
₹1.4 L
Closing Date
29 Jan 2024, 3:30 pmClosed
S.E. (PandW)
O/o Addl. C.E.(PandW), SSTPP
Work of Fibre reinforced polymer (FRP) epoxy based painting/lining work along with plastering, repairing / reconstruction work in equalization tank (Guard Pond) in Effluent Treatment Plant 2x600MW, Stage-1, SSTPP, MPPGCL Dongalia.
2023_MPPGC_317084_1
WT-2134
Open Tender
Miscellaneous Works
Lump-sum
60 days
SSTPP, Dongalia
As per tender documents
21 documents required · 21 mandatory
₹2,000
Yes
₹1.4 L
Yes
10 Oct 2025
22 Dec 2023
30 Jan 2024
22 Dec 2023
29 Jan 2024
22 Dec 2023
Work of Fibre reinforced polymer (FRP) epoxy based lining work (Thickness 4 mm) in Equalization tank (Guard pond with vinyl ester resin) along with plastering , repairing / reconstruction work in Effluent Treatment Plant at 2X600 Stage – I, SSTPP, MPPGCL, Distt. – Khandwa
FRP Lining (Thickness 4 mm) in existing equalization tank with vinyl ester resin (i) 02 Nos Guard Pond Size along with top of boundary wall: 1650 M2 (ii) 02 Receiver Tank Size along with top of boundary wall: 04 M2 Total Area for FRP Lining: - 1650+ 04 = 1654 M2
Existing equalization tank – Repairing withreconstruction of bottom 100 mm thick RCC-M25 (i) 02 Nos Guard Pond Size –20x20x0.1(meter height) = 40x2= 80M3 (ii) 02 Receiver Tank Size & other side: - 5 M3 Total Area: - 80+05=85 M3
(i). Re-plastering &plastering workof 02 Nos Guard PondTank size – 20x 20 x 5 meter (Height) = 800M2 (ii). Re-plastering & plastering work of 02 Nos Receiver Tank size –2 M2
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .