Loading…
Loading…
Tender Value
₹56.2 L
EMD Value
₹1.1 L
Closing Date
7 Sept 2026, 4:00 pm
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Construction of Flood Protection works by way of Toe Crates, Channelization / Resectioning at Pallot Nallah Chorwan, Barzullah Nallah at Achoora, Bagtore Nallah /Kishan Ganga River at Bagtore in Gurez/Bagtore sector from RD 60.00km to 80.00km for a l
2026_PWDJK_322438_4
(InFC) E-NIT No of 11 of 2026-27 EE-Hyd-Grz-474-80 E-tendering Dated-25-08-2026
Open Tender
Civil Works
Percentage
120 days
Gurez
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
Executive Engineer Hydraulic Division Gurez
₹1.1 L
Executive Engineer Hydraulic Division Gurez
27 Aug 2026
27 Aug 2026
8 Sept 2026
27 Aug 2026
7 Sept 2026
27 Aug 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 2,442.25 | Cum | 187.3 | ₹4,57,433.43 |
| 1.01 | Ordinary Rock. | 0.6 | Cum | 392.8 | ₹235.29 |
| 1.02 | Hard Rock. | 0.6 | Cum | 1,128.25 | ₹676.95 |
| 3 | Hand-Packing stones in wire-crates(GI) Incl.cost of stones but excluding cost of crates. | 1,776.96 | Cum | 1,071.15 | ₹19,03,390.7 |
| 4 | Supply of 4mm dia G.I wire woven crates 4”x4” mesh as per ISI specification .As directed by EIC. | 7,282.89 | Sqm | 247.48 | ₹18,02,369.62 |
| 5 | Carriage of Material by MT Incl.loading ,unloading and stacking complete job. Crates avg.lead of 85km. | 16.38 | MT | 3,000.63 | ₹49,150.32 |
| 5.01 | Stones avg.lead of 5km. | 1,510.41 | Cum | 236.16 | ₹3,56,698.43 |
| 6 | Carriage of Material by Head load incl. loading ,unloading and stacking complete job . Crates avg.lead of 100mtrs. | 16.38 | MT | 168.01 | ₹2,752 |
| 6.01 | Stones avg.lead of 100mtrs. | - | Cum | 287.48 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1080933.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].