| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAdmitted-Finance BIRBHUM TIKARBETA JOYDEB KENDULI BARDHAMAN BARDHAMAN 713324 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713324 | ₹41.3 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S S ENGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Part A:Repairing/fabrication of head gear structure | ||||
| 1.01 | Head gear foundation complete broken by compressor
hammer machine by vibrating machine by suitable different types of special arrangement both side. | 2 | set | 24,500 ₹49,000 |
| 1.02 | After broken the foundation has cutting using
DA+Oxygen, cuttlng electrode, special type of grinder, face grinding with all type of cutting stones, grinding stones both side. | 2 | AU | 11,000 ₹22,000 |
| 1.03 | Head gear complete old and used structure dismantling
by the arrangement of temporary platform making around head gear structure lime bamboo, coconut coir, pipe, side of safe work Plank ( Takhta) etc. both. | 2 | AU | 75,000 ₹1.5 L |
| 1.04 | Dismantling cutting old bolts nuts from head gear
structure grinding and Revit cutting both side of head gear | 2 | AU | 45,000 ₹90,000 |
| 1.05 | After revit and bolt cutting head gear structure cutting by
welding electrode gas cutting with safety belt warred skilled man power for safe work in both side | 2 | AU | 62,500 ₹1.3 L |
| 1.06 | Both side head gear dismantling, after cutting by the help
of boom crane 45Tone other place of Colliery both side | 10 | DAY | 20,000 ₹2 L |
| 1.07 | Platform removes (Opening) after dismantling both side
of structure. | 2 | AU | 42,500 ₹85,000 |
| 1.08 | Complete both side head gear leg structure new
fabrication both side 1st by required materials at colliery site as bellow. | 2 | AU | 78,500 ₹1.6 L |
| 2.00Part B. Consumable items day to day fabrication. | ||||
Updated dates
Tender Value
₹41.4 L
EMD Value
₹51,800
Closing Date
14 Mar 2026, 4:00 pmClosed
GM SSA
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Repairing / fabrication of Head Gear Structure (Old and Damaged) of 4 No Pit and 5 No. Pit (Dismantling and Newly Making) as per recommendation of Structural audit carried out at Chapui Khas Colliery Under Satgram- Sripur Area
2026_ECL_354789_1
ECL/SSA/GM/E M/E-NIT/2025-26/139 dt 26.02.2026
Open Tender
Miscellaneous Works
120 days
Chapui Khas Colliery, SSA
Please refer Tender documents.
4 documents required · 4 mandatory
₹51,800
23 Mar 2026
28 Feb 2026
16 Mar 2026
28 Feb 2026
14 Mar 2026
28 Feb 2026
28 Feb 2026 - 5 Mar 2026
Part A:Repairing/fabrication of head gear structure
Head gear foundation complete broken by compressor hammer machine by vibrating machine by suitable different types of special arrangement both side.
After broken the foundation has cutting using DA+Oxygen, cuttlng electrode, special type of grinder, face grinding with all type of cutting stones, grinding stones both side.
Head gear complete old and used structure dismantling by the arrangement of temporary platform making around head gear structure lime bamboo, coconut coir, pipe, side of safe work Plank ( Takhta) etc. both.
Dismantling cutting old bolts nuts from head gear structure grinding and Revit cutting both side of head gear
After revit and bolt cutting head gear structure cutting by welding electrode gas cutting with safety belt warred skilled man power for safe work in both side
Both side head gear dismantling, after cutting by the help of boom crane 45Tone other place of Colliery both side
Platform removes (Opening) after dismantling both side of structure.
Complete both side head gear leg structure new fabrication both side 1st by required materials at colliery site as bellow.
Part B. Consumable items day to day fabrication.
Cutting electrode 21.03
Welding electrode duroehrome
DA and oxygen ( 3nos DA and 12 nos oxygen)
Revit 4x6/8 EN Grade
HT BOLT & Nut
Revit machine charges day to day
Welding machine
Grinding machine (all types stones)
Magnet drill machine
Boom crane 45Ton day to day work
Alignment
Skilled Labour cost
After complete the foundation and head gear leg both fitting by boom crane 45 provided 2 days
After that then temporary platform new making for reuniting/bolting welding finally setting and fitting as dper original profile both side
Skilled man power for erection
Part C.New head gear base foundation making both side
Civil job towards erection of R.S. joist stay in two sides
Digging of foundation area for preparation of new making and digging of ground both side 2 set
Supply of 12mm and 8mm rod
Supply of 16 mm tor load
Supply of stone chips
Supply of cement
Dhalai mixing machine
Mason and labour cost for civil job towards erection of R.S. joist stay in two sides
Material cost for ISMC -250
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.80 MB
BOQ_367619.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid