| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹25.9 LAccepted-Finance | 1 | Accepted-Finance ok | |
| 2 | 2₹32.5 L+₹6.6 L (25.4%)Accepted-Finance | 2 | Accepted-Finance ok | |
| 3 | 3₹32.5 L+₹6.6 L (25.5%)Accepted-Finance | 3 | Accepted-Finance ok | |
| 4 | 4₹32.7 L+₹6.7 L (26.0%)Accepted-Finance | 4 | Accepted-Finance ok | |
| 5 | 5₹34.3 L+₹8.4 L (32.4%)Accepted-Finance | 5 | Accepted-Finance ok |
Tender Value
₹40.6 L
EMD Value
₹81,266
Closing Date
29 Jun 2023, 6:00 pmClosed
DFO Udhampur
DFO OFFICE COMPLEX UDHAMPUR
Chain link fencing with toe wall at 93/D Patnitop Dudu Forest Range of Udhampur Forest Division
2023_FD_218010_1
67 NIT of 2023-24
Open Tender
Civil Works
Item Wise
60 days
comptt no. 93/D
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO Udhampur
₹81,266
1 Jul 2023
22 Jun 2023
30 Jun 2023
22 Jun 2023
29 Jun 2023
22 Jun 2023
22 Jun 2023 - 27 Jun 2023
Amount
Chain Link Fencing S.No. 1 to 9 Clearing jungle including uprooting of rank vegetation, grass brush wood, trees and saplings upto girth of 30 cms measured at a height of 1m above ground level and removal of rubbish upto a distance of 50 cm outside the periphery of area cleared. complete job.
Excavation work in excavation by manual means for foundations, drains, pipes, cables etc and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m including the disposal of excavated earth upto 1 m from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10. including all leads lift carriage complete Job.
Providing and laying in position cement concrete specified grade excluding the cost of centenng. Shuttering -All work upto plinth level. 1:2:4 crushed including all leads lift carriage complete Job.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:3:6. crushed with 20% bouler including all leads lift carriage complete Job.
Centering and shuttering including strutting, propping etc. and removal of form for: foundations, footings, bases of columns etc for mass concrete. Complete job
Providing and fixing at site angle iron post & strut of required size including bottom to be split and bent at angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia etc complete job.
Providing and fixing G.I Chain link fabric fencing of required width in mesh size 50 x50 mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per direction of Engineer-in-charge. Made of G.I wire of dia 4mm Complete job
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture
G.I Wire Fencing Work (S.no 10 to 21) Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth upto 30cm measured at height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphery of the area cleared. Complete job
Earth work in excavation by manual means for foundation, drains, pipes, cables etc. and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5m including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed all kinds of soil. Complete job
Providing and Laying in position Cement concrete of specified grade including curing but excluding cost of centering, shuttering, All work up to plinth level in 1:5:10(Crushed) including carriage. Complete job
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4Crushed.(including carriage). Complete job
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exeeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m complete job
Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete. Complete job
Finishing walls with water proofing cement paint of required shade on new work . Complete job
Supply of precast cement conc. poles of size 100mmx75mmx1800mm. (Including all mechanical/manual transport/leads to working site) Complete job
Erecting/fixing c.conc. Poles in position with lifting to site (including carriage) Complete job
Fencing with R.C.C.posts placed at required distance, embedded in cement concrete blocks, provided with 5 horizontal lines and two diagonals of barbed wire 9.38 kg per 100 metres (min) between the two posts fitted and fixed with G.l. staples on wooden plugs or G.l. binding wire tied to 6 mm bar nibs fixed while casting the post: Payment to be made per meter cost of total length of barbed wire used. With G.l. barbed wire. Complete job
Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladders, railings, brackets, gates & similar works with iron angle 40x40x6 mm & flat 40x6mm. Complete job
Sign board incl carriage PAINTING &WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet. Complete job
DRSM Work: Carriage of Nallah Stones from near by area to construction site to be used for Construction of DRSM's Dressing of Stones and Preparation of beds in the Nallahs. Construction of DRSM and Making proper spillway. (deducting voids 15%)
Plantation (Polybagged) ; Transportation of saplings from different nurseries of Forest Department by mechanical transport to the above work site, then site clearance, digging of pits of 45cmx45cmx45cm including excavation of Soil and Planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of three month. the item inlcudes all carriages , loading and unloading. complete job
Patch Sowing: a. Clearance of site and disposal of unwanted material. b. Digging of patches in all types of soil of size (45x45x15) cm. c. Removal of unwanted material/pebbles etc. from the excavated earth and their disposal. d. Preparing the patches. e. Sowing of Good Quality seeds 3 to 4 No. in each patches(includes the cost of seeds). Seed species to be provided by Unit Incharge/RFO. complete job
M/s Mohd Firdoos Rather
KULBEER SINGH
MOHD RAFIQ WANI
JUGAL KISHORE
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .