Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹36.1 L+₹57,640 (1.62%)Rejected-Finance | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹38.3 L+₹2.8 L (7.80%)Rejected-Finance FLAT NO B 401 4TH FLOOR NAVADURGA CO OP HSG SOCIETY LTD PLOT NO 7 SECTOR 19A NERUR EAST NAVI MUMBAI THANE MAHARASHTRA 400 706 | NAVI MUMBAI | THANE | MAHARASHTRA | 400706 | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹43.2 L+₹7.7 L (21.7%)Rejected-Finance A 303 SHREE KRISHNA COMPLEX CO OP HSG SOC LTD WESTERN EXPRESS HIGHWAY OPP NATIONAL PARK BORIVALI E MUMBAI 400066 | MUMBAI SUBURBAN | MAHARASHTRA | 400066 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹44.4 L+₹8.9 L (25.1%)Rejected-Finance | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
24 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) Mumbai
Commander Works Engineer NW Dr Homi Bhabha Road Navy Nagar Colaba Mumbai 05
PERIODICAL SERVICES TO CERTAIN BLDG IN ZONE 1 3 UNDER AGE I UNDER GE NW KUNJALI COLABA MUMBAI
2022_MES_538336_1
8482/CWE (NW) Mumbai/ E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) KUNJALI
Class C
7 documents required · 7 mandatory
₹1,000
Yes
GE (NW) Kunjali
₹1.4 L
Yes
20 Sept 2022
15 Jul 2022
26 Aug 2022
15 Jul 2022
24 Aug 2022
10 Aug 2022
15 Jul 2022 - 8 Aug 2022
Amount
Material and labour for Preparation of old plastered or unplastered decorated surfaces of wall including cornices, pillasters etc and applying one coat of white wash on walls complete all as specified and directed by Engineer-in-Charge.
All as per item No 1 above but in ceiling complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces of walls by washing rubbing down and stopping of distempered and painted surfaces and applying one coat of oil bound distemper (oil emulsion) on walls complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces of ceilings / boards by washing, rubbing down and stopping and applying one coat of oil bound distemper (oil emulsion) on ceilings complete all as specified and directed by Engineer-in-Charge.
Material and labour for preparation of old decorated surfaces of walls by washing rubbing down and stopping of distempered and painted surfaces and applying two coat of oil bound distemper (oil emulsion) on walls complete all as specified and directed by Engineer-in-Charge.
Material and labour for applying 3mm thick one coat wall care putty on walls / ceilings etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces of wall / ceiling over 10cm width or girth and stopping of painted surface and applying one coat of plastic emulsion paint on walls complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old decorated surfaces of wall / ceiling over 10cm width or girth and stopping of painted surface and applying two coats of plastic emulsion paint on walls complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old painted wooden surfaces of any description over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old painted steel surfaces of any description not otherwise over 10 cm in width or girth and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of old plastered or unplastered decorated surfaces of wall including cornices, pillasters etc. stopping of distempered / painted and applying one coat of synthetic enamel paint complete all as specified and directed by Engineer-in-Charge.
Material and labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc. and applying one coat of acrylic exterior paint with and including errection and dismantling of scaffolding to carrying out works 1 to 4 storey buildings complete all as specified and directed by Engineer-in-Charge.
Material and labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc. and applying one coat of acrylic exterior paint with and including errection and dismantling of scaffolding to carrying out works 5 to 8 storey buildings complete all as specified and directed by Engineer-in-Charge.
Material and labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces applying one coat of wall care putty, 3mm thick etc. and applying two coats of acrylic exterior paint with and including errection and dismantling of scaffolding to carrying out works 1 to 4 storys buildings complete all as specified and directed by Engineer-in-Charge.
Material and labour for preparation of surfaces of walls, chajjas, parapets of an old surfaces etc and applying two coats of acrylic exterior paint with and including irrection and dismantling of scaffolding to carrying out works 5-8 storeys buildings complete all as specified and directed by Engineer-in-Charge.
Material and labour for french polishing on surfaces of any description , width or girth including cleaning and preparing the surface including a coat of wood filler and applying one or more coats on old works complete all as specified and directed by Engineer-in-Charge.
Taking down cement plaster on brick/ surfaces built in cement mortar including raking out joints, bading for key scrubbing down with water etc complete all as specified and directed by Engineer-in-Charge.
Material and labour for rendering 15 mm thick in CM 1:6 on fair faces of brick work or concrete surfaces finishing the surface even and smooth with and including 1 mm thick sagol finish complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of new plastered surfaces of walls and applying two coats of oil bound distemper over a coat of chalk whiting on plastered surfaces incl preparatory to distempering complete all as specified and directed by Engineer-in-Charge.
Material and labour for plastering in CM 1:4, 20 mm thick in two coats (15 mm under coat plus 5mm finishing coat) with water proofing compound at the rate of 3% by weight of cement and finishing the surface even and fair complete all as specified and directed by Engineer-in-Charge. (WPC will be measured and paid seperately).
Material and labour for preparation of newly plastered wall surfaces over 10cm girth applying two coats of 100% acrylic weather resistant emlusion over a coat of exterior wall primer complete all as specified and directed by Engineer-in-Charge.
Material and labour for Preparation of floor PCC, interlocking tiles, chequered tiles, any floor tiles any description and applying one coat of glossy floor paint (indigo) paints complete all as specified and directed by Engineer-in-Charge.
Material and labour removal of tree roots and branches spread over stone wall joints and making good the stone wall joints by flush pointing in CM 1:4 including provision of necessary scaffolding and removing the debris outside MOD land complete all as specified and directed by Engineer-in-Charge.
Supply only integral water proofing compound of ISI marked complete all as specified and directed by Engineer-in-Charge.
Material and labour for mettalic texture painting on wall/ceiling surfaces, design and pattern as approved complete all as specified and directed by Engineer-in-Charge.
Material and labour clean plastered surface and remove all lose particles, dirt, vegetation etc. vegetation etc. Define the crack with sharp edge tool then clean and moisten. Providing and applying ready to use acrylic polymeric non - shrink "PAINTEX-4" upto to 5mm to 12mm wide cracks and finish at all heights, level etc. complete after 24 hours inspect and if required as a result of auto-suction, provide another filling over the same complete all as specified and directed by Engineer-in-Charge.
Material & labour for cleaning the existing cracked surface of wall & Column surface by scrubbing so as to remove all the dust, dirt, grime, oil etc and washing the surface with Jet of water and applying one coat of FUTURA SEALER COAT in CHOWKSEY CHEMICALS (or equivalent in FOSROC, ASIAN, BERGER etc) @ 8-10 SQM , then after 4-5 hours apply two layer of finish coats of FUTURA-5 PLUS in CHOWKSEY CHEMICALS (or equivalent in FOSROC, ASIAN, BERGER etc) @ 4-4.5 SQM coat duly included erection and dismantling of scaffolding upto 9 storey building, complete all as specified and directed by Engineer-in-Charge. Note: Rate should be included with filling the cracks with acrylic polymeric non shrink compound like Paintex-4 in CHOWKSEY CHEMICALS or equivalent in other approved makes.
Satyanarayan Trading Co.
ROHIT CONSTRUCTION
Nilesh Construction
SUNRISE CONSTRUCTION CO
ASHOK CONSTRUCTION
Shetty Construction Co
RAJENDRA CONSTRUCTION
jalandhara construction
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .