| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 CrAccepted-AOC 102 IST FLOOR DEVIKA CHAMBER RDC RAJ NAGAR GHAZIABAD U P | GHAZIABAD | UTTAR PRADESH | 201001 | ₹6.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹6.9 Cr+₹44.2 L (6.89%)Rejected-Finance PLOT NO 54 UDYOG KENDRA II ECOTECH III GREATER NOIDA | GREATER NOIDA | GAUTAM BUDH NAGAR | UTTAR PRADESH | ₹6.9 Cr+₹44.2 L (6.89%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹6.9 Cr+₹50.2 L (7.82%)Rejected-Finance | ₹6.9 Cr+₹50.2 L (7.82%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹7.4 Cr+₹97.2 L (15.1%)Rejected-Finance SHANTI HEIGHTS MANGAL PANDEY NAGAR MEERUT UP | MEERUT | MEERUT | UTTAR PRADESH | ₹7.4 Cr+₹97.2 L (15.1%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹7.9 Cr+₹1.5 Cr (23.0%)Rejected-Finance | ₹7.9 Cr+₹1.5 Cr (23.0%) | L5 | Rejected-Finance Rejected |
Tender Value
₹10.2 Cr
EMD Value
₹20.4 L
Closing Date
10 Jan 2025, 12:00 pmClosed
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Widening and Strengthening of Bulandshahr-Tajpur in Km 3, 4, 5, 6, 7in District Bulandshahr.
2024_CEMRT_987671_1
7486/96M/E-Tender/BSR Circle/2024-25 dt. 07.10.2024
Open Tender
Civil Works - Roads
Item Wise
365 days
Bulandshahr
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,714
₹20.4 L
Yes
SE BSR Circle PWD Bulandshahr
18 Feb 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
10 Jan 2025
28 Dec 2024
28 Dec 2024 - 30 Dec 2024
30 Dec 2024
Amount
Cleaning jungle including up rooting of rank,vegetations grass,push,wood trees & samplings of grith upto 30 cms. measured at a height of 1 M. above ground level & removal of rubbish up to a distance of 50M. out side the periphery of area cleared of area cleared.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of embankment with approved material obtained from borrow pits with all lifts & leads with 1 km, transporting to site,spreading,grading to required slope and compacting to meet requirement of table 300-2. .Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Earth work in excavation of foundation of structures as per drawing & technical specification,including setting out,construction of shoring & bracing,removal of stumps & other deleterious matter,dressing of sides & bottom, backfilling the excavation earth to the extent required & utilising the remaining earth locally for road work. .Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. MORT&H Specification 401 Sr No 4.1.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing,laying,spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site,laying in uniform layers with paver in sub-base / base course on well prepared surface & compacting with vibratory roller to achieve the desired density As per MORTH Clause 406.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing,laying,spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC and ordinary Portland Cement @ 1 % By weight of Mix and 3.5 % Emulsion SS2 By weight of Mix in mechanical mix plant carriage of mixed Material by tipper to site,laying in uniform layers with paver in sub- base / base course on well prepared surface & compacting with vibratory roller to achieve the designed ITS (Indirect Tensile Strength)..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing & applying tackcoat with bitumen VG-10 using Bitumin pressure distributor at the rate of 0.25 kg. per sqm. On the prepared bituminous/ granular surface cleaned with mechanical broom.As MORTH clause 503.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing and laying bituminous concrete with Higher Capacity batch type HMP producing an average output of 30 cum per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.40% of mix and filter, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORT&H Specifications Clause 509 complete in all respects.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Supply & Laying 80mm thick I shaped mechanically compressed interlocking cement concerete paver blocks manufactured by high pressureand control vibration machine having plan dimension 200x(160+120mm) with minimum 5mm thick topping of O.P.Cement mixed with 25% marble powder.The compressive strength of concerete paver block shall not be less than 40 MPA and 5.0 kg per no.Including levelling & dressing of surface up to required level & slopes,filling joints with fine sand including cost of material,labour,T&P etc required for proper completion of the work as directed by Engineer in charge. Including cost of 4 cm thick local sand bed.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Dismantling of existing structures like culverts,bridges, retaining walls & other structure comprising of masonry,cement concrete, wood work,steel work, including T&P & scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material & stacking the serviceable material with all lifts & lead of 1000 metres As per Clause 202.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Plain Cement Concrete (grade M 10) in Open Foundation complete as per Drawing and Technical Specifications..Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST
Plain Cement Concrete (grade M 20) in Drain Wall complete as per Drawing and Technical Specifications..Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST
Reinforced Cement Concrete in Superstructure complete as per Drawing & Technical Specifications. RCC Grade M25. Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST
Supplying,fitting & placing HYSD bar reinforcement in sub-structure complete as per drawing & Technical Specifications MORT&H Specification 1600,2200 Sr No 13.6..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Brick masonry work in 1:3 in sub-structure complete excluding pointing & plastering,as per drawing & Technical Specifications as per MORTH specification clause No. 1300 & 2100 Sr No 13.1..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
12 mm thick plaster with cement and fine sand of 1.25 fineness modules in 1:3 over brick work minimum thickness not to be less than 1cm.Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment,wing wall/return wall with 110 mm dia PVC pipe,extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing & Technical Specifications MORTH 13.08 (2706 & 2200)..Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Cement concrete with 2cm gauge approved stone ballast, coarse sand and cement in the proportion 4:2;1. Including cost of all material,labour,T&P, labour cess,royality & all taxes complete But Excluding GST
Supply & laying of NP-3 s/s 600mm dia Hume pipe culvert including cost of hume pipe,cartage,fixing of proper alignment.Including cost of all material,labour, T&P,labour cess,royality & all taxes complete But Excluding GST.For 15m
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IInd Year 0.25% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IIIrd Year 0.50% of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.IVth Year 0.75 % of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/ 113/2023 Dated 16.01.2024 or As per Pervailing GO
Five Year maintenance of (Undulation,Pot Holes /Patch Repair including Embankment,Patri Road sides,cross drains hume pipe culvert & all road signages etc) to the required standards & in the manner as defined in CB Condition & keep the entire road surface & structure in Defect free condition during the entire maintenance period which began from the actual completion date,including cost of all material, labour,T&P, labour cess,royality & all taxes complete.But Excluding GST.Vth Year 1.00 % of workdone cost As per GO no.17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 or As per Pervailing GO
J S S Infratech (BID ID -4831031)
M/S VIJAY KUMAR (BID ID -4826770)
M/S SHANTI ASSOCIATES (BID ID -4828644)
Raja contractors & engineers (BID ID -4831580)
M/S KRV ASSOCIATES (BID ID -4828957)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .