Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.4 CrAccepted-Finance | ₹1.4 Cr | 1 | Accepted-Finance As per RFP |
| 2 | 2₹1.6 Cr+₹16.6 L (11.7%)Accepted-Finance | ₹1.6 Cr+₹16.6 L (11.7%) | 2 | Accepted-Finance As per RFP |
| 3 | 3₹1.6 Cr+₹18.0 L (12.8%)Accepted-Finance | ₹1.6 Cr+₹18.0 L (12.8%) | 3 | Accepted-Finance As per RFP |
| 4 | 4₹1.6 Cr+₹23.3 L (16.5%)Accepted-Finance | ₹1.6 Cr+₹23.3 L (16.5%) | 4 | Accepted-Finance As per RFP |
| 5 | 5₹1.7 Cr+₹23.7 L (16.8%)Accepted-Finance | ₹1.7 Cr+₹23.7 L (16.8%) | 5 | Accepted-Finance As per RFP |
Tender Value
₹2.0 Cr
EMD Value
₹4 L
Closing Date
23 Apr 2026, 3:00 pmClosed
Deputy Director
IAHE, A-5, Sector 62, Noida, UP-201309
Interior Furnishing Works in Lecture Halls, Computer Halls, Seminar Hall and Director Room (incl. Washroom) at IAHE Campus, Noida
2026_MoRTH_904217_1
IAHE/Admin/22/ Renos-LecHalls/2025-26
Open Tender
Civil Works - Buildings
Percentage
120 days
IAHE, A-5, Sector 62, Noida, UP-201309
as per RFP Document
8 documents required · 8 mandatory
₹0
₹4 L
Yes
IAHE, A-5, Sector 62, Noida, UP-201309
17 Jun 2026
1 Apr 2026
24 Apr 2026
1 Apr 2026
23 Apr 2026
1 Apr 2026
1 Apr 2026 - 23 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | - | sqm | - | - |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : Of area 3 sq. metres and below | - | each | - | - |
| 3 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer- in-charge. | - | sqm | - | - |
| 4 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-incharge, beyond 50 m initial lead, for all leads including all lifts involved. | - | cum | - | - |
| 5 | Dismantling Wash Basin of any size including dismantling of trap, unions, waste coupling, C.P. fittings etc., stacking useful materials within 50m lead and disposal of unserviceable materials into municipal dumps (within 50m) as per direction of Engineer-in-Charge. | - | each | - | - |
| 6 | Dismantling W.C. Pan of all sizes including disposal of dismantled materials including malba all complete as per directions of Engineerin-Charge. | - | each | - | - |
| 7 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | - | cum | - | - |
| 8 | Dismantling 15 to 40 mm dia G.I. pipe including stacking of dismantled pipes (within 50 metres lead) as per direction of Engineer-in-Charge. (a) Internal Work- Exposed on wall | - | meters | - | - |
| 9 | Dismantling and removing existing acoustic wall paneling works comprising of fabric covering, internal acoustic infill (Glass wool / Rock wool / Poly-fill foam), plywood backing, and the supporting wooden or aluminum framework/grid. Scope includes: 1. Carefully removing materials without damaging the underlying masonry, adjoining structures, false ceiling, or flooring. 2. Disconnecting and taping off any concealed electrical conduits/wiring found within the paneling. 3. Making good the surface of the wall by filling screw holes and minor patches with POP/Putty to restore the base surface. 4. Sorting and stacking serviceable material (if any) within a lead of 50 meters. 5.Disposal of unserviceable material (malba/debris) to the nearest municipal dumping ground authorised by local bodies. | - | sqm | - | - |
| 10 | Dismantling and removing existing acoustic flooring system complete comprising of: Removal of top finish layer(vinyl, timber, carpet etc) , Removal of bonded acoustic underlay(rubber, cork, or foam mats). , Scrapping and cleaning the sub floor surface to remove stubborn adhesive residues, nails, or tack strips to make the surface true and level for new surface. , Stacking of serviceable and disposal of unserviceable material within 50 meters lead as directed by Engineer in charge Note:- Measurement shall be taken for the finished floor area clear of skirting | - | sqm | - | - |
stage.html
html • 0.09 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 17.81 MB
BOQ_950411.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .