| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.0 LAccepted-AOC | ₹51.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51 LRejected-AOC BALIPARA MANGALDAI P O P S SIPAJHAR DARRANG ASSAM 784145 | DARRANG | ASSAM | 784145 | ₹51 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAJLOSON SARMA L2 | HIMANGSHU GAUTAM L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying and driving Sal piles 25cm.to 30cm dia. dressed to heart wood including marking length in every30cms.interval, coal tarring 2(Two)coats with best tar applied hot(Rate inclusive of the cost for therequired quantity of tar).
A. With pile engine
(i) Portion of pile actually driven under ground | 192 | RM | 8,504.38 ₹16.3 L | 8,504.38 ₹16.3 L |
| 2.00 | Supplying and driving Sal piles 25cm.to 30cm dia. dressed to heart wood including marking length in every30cms.interval, coal tarring 2(Two)coats with best tar applied hot(Rate inclusive of the cost for therequired quantity of tar).
A. With pile engine
(i) Portion of pile actually driven above ground | 187 | RM | 8,388.22 ₹15.7 L | 8,388.22 ₹15.7 L |
| 3.00 | Supply fitting & fixing 'U' shaped flat iron strap making 0.5m x 0.3m size from 150mm x 12mm size MS flat including providing 10 bolts holes aand fitting with 0.35m long 20mm dia MS bolts inclding fitting tightly with bearing beam, pile and R.S.J. beams etc. as directed by Department. | 24 | each | 1,797.04 ₹43,128.96 | 1,797.04 ₹43,128.96 |
| 4.00 | Supplying, fitting and fixing Sal Sawn timber
beam and bearing beam rectangular in size fitted with M.S.cleats, straps etc.supplying spikes etc.as necessary and coaltering two(2)coats with best tar applied hot as directed (Rate is inclusive of cost of the required quantity of tar) | 1.32 | cum | 34,955.59 ₹46,071.47 | 34,915 ₹46,017.97 |
| 5.00 | Labour for fitting and fixing old R.S.J.beams, C.I.saddle etc .in position including necessary scaffolding, cutting them to required size, drilling holes and supplying and fixing necessary bolts and nuts, painting two(2)costs complete(Tar-steel paint to be supplied by the contractor at his own cost) including carrying from PWD godown. | 228.96 | Qntl | 896.09 ₹2.1 L | 896.09 ₹2.1 L |
| 6.00 | Sal wood work including supplying, fitting and fixing complete with necessary M.S. bolts, nuts, nails, screws etc. and coal tarring two(2)coats with best tar applied hot(Rate is inclusive of the cost of therequired quantity of tar).
a) Undressed in floor planks, collars, bracing, standards, wheel guards, struts and railing, runner belts, rail posts etc. | 22.98 | cum | 31,789.16 ₹7.3 L | 31,789.16 ₹7.3 L |
| 7.00 | Sal wood work including supplying, fitting and fixing complete with necessary M.S. bolts, nuts, nails, screws etc. and coal tarring two(2)coats with best tar applied hot(Rate is inclusive of the cost of therequired quantity of tar).
b) In Trackway Planks (alternate nailing to be done in a staggered way). | 2.46 | cum | 46,477.35 ₹1.1 L | 46,477.35 ₹1.1 L |
| 8.00 | Azar or Nahar or Nageswar or Zarul or Sundi or Gamari Wood work including supplying,fitting and fixing complete with necessary M.S.bolts,nuts,nails,srews etc.and coal tarring two(2) coats with best tar applied hot(Rate is inclusive of the coast of the required quantity of tar)
a) Undressed in floor planks, collars, bracing, standards, wheel guards, struts and railing, runner belts, rail posts etc. | 2.23 | cum | 23,509.64 ₹52,473.52 | 23,509.64 ₹52,473.52 |
| 9.00 | Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mm x 100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department. | 52 | RM | 13,589.49 ₹7.1 L | 13,589.49 ₹7.1 L |
Tender Value
₹51 L
EMD Value
₹1.0 L
Closing Date
10 Dec 2025, 4:00 pmClosed
Executive Engineer PWRD MDSTRD
Mangaldai Dalgaon and Sipajhar TRD Mangaldai Darrang
Construction of SPT Br No 3/1 on Rangamari Kurua embankment under SOPD G for the year 2025-26 under PWRD Mangaldai Dalgaon and Sipajhar Territorial Road Division Sipajhar LAC
2025_PWD_48739_1
MDSTRD_SPJ_SOPD-G_25_26_1
Open Tender
Civil Works - Bridges
Sipajhar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,020
₹1.0 L
Yes
Mangaldai
8 Jun 2026
21 Nov 2025
11 Dec 2025
29 Nov 2025
10 Dec 2025
30 Nov 2025
8 Dec 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Document
1.54 MB
Additional Documents
Additional Documents • 0.31 MB
Tender Documents
Tender Documents • 1.53 MB
BOQ
BOQ • 0.36 MB
Download all tender documents and submit your bid