Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.0 LAccepted-AOC H NO 13 BHARAT COLONY SECTOR 88 GREATER FARIDABAD DISTT FARIDABAD 121002 | FARIDABAD | FARIDABAD | HARYANA | 121002 | L1 | Accepted-AOC work allotted | |
| 2 | L2₹19.0 L+₹4,634 (0.24%)Rejected-Finance 1876 3 RAJEEV NAGAR STREET NO 8 GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | L2 | Rejected-Finance Rate are at higher side | |
| 3 | L3₹20.5 L+₹1.6 L (8.26%)Rejected-Finance | L3 | Rejected-Finance Rate are at higher side | |
| 4 | L4₹22.0 L+₹3.0 L (16.0%)Rejected-Finance HOUSE NO 54 VILLAGE TAURU TEHSIL NUH DISTT MEWAT HARYANA 122105 | TAURU | MEWAT | HARYANA | 122105 | L4 | Rejected-Finance Rate are at higher side | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Kuldeep Singh Contractor L1 | Hariom Engineers L2 | CHARAN SINGH L4 | M/s Mohd. Danish Contractor L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Material required- Mechanical and Electrical works, detail given below.
Supply and fixing of 2½” Pump Nipple G.I. new making with flange | 3 | Each | 650 ₹1,950 Lowest | 2,450 ₹7,350 | 3,000 ₹9,000 | 2,500 ₹7,500 |
| 2.00 | Supply and fixing of 2½” MS Clamp HD | 3 | Each | 850 ₹2,550 Lowest | 1,400 ₹4,200 | 3,000 ₹9,000 | 1,500 ₹4,500 |
| 3.00 | Supply and fixing of Panel box Hut | 3 | Each | 6,500 ₹19,500 Lowest | 8,000 ₹24,000 | 10,000 ₹30,000 | 8,000 ₹24,000 |
| 4.00 | Labour charge for making tee connection with existing line excavation, cutting, jointing and making and making connection with existing line complete in all respects | 3 | Each | 5,500 ₹16,500 | 2,500 ₹7,500 Lowest | 4,000 ₹12,000 | 2,500 ₹7,500 Lowest |
| 5.00 | cost of connection charges for 1 Nos. Electric Connection to be deposit with DHBVN (load 10 HP 8 N kw) (Security, Meter Cost, Meter testing, 25mm square x3 core aluminum cable etc. complete), | 3 | Each | 48,000 ₹1,44,000 | 45,000 ₹1,35,000 Lowest | 50,000 ₹1,50,000 | 45,000 ₹1,35,000 Lowest |
| 6.00 | Supplying, erection, testing and commissioning of submersible pumping sets KSB Make 5HP, 25 Stage | 3 | Each | 48,000 ₹1,44,000 | 41,000 ₹1,23,000 Lowest | 50,000 ₹1,50,000 | 41,500 ₹1,24,500 |
| 7.00 | Supply and Fixing GI Pipe 2.5 inch Horizontal both side flange fitted length as per site requirement | 3 | Each | 1,050 ₹3,150 Lowest | 1,900 ₹5,700 | 3,000 ₹9,000 | 2,500 ₹7,500 |
| 8.00 | Supply and Fixing GI Pipe 2.5 inch Vertical both side flange fitted length as per site requirement | 3 | Each | 1,050 ₹3,150 Lowest | 2,200 ₹6,600 | 3,000 ₹9,000 | 2,500 ₹7,500 |
| 9.00 | Supply and fixing of DI Tee 3”x3”x3” D/D | 3 | Each | 1,950 ₹5,850 Lowest | 2,000 ₹6,000 | 3,000 ₹9,000 | 2,500 ₹7,500 |
| 10.00 | Supply of D.I Duck foot Bend D.I duck foot bend 3” D/F | 3 | Each | 1,550 ₹4,650 Lowest | 1,800 ₹5,400 | 3,000 ₹9,000 | 2,500 ₹7,500 |
Tender Value
₹19.4 L
EMD Value
₹38,820
Closing Date
11 Sept 2025, 6:55 pmClosed
NITIN KADIAN
Municipal Corporation Faridabad
Estimate for Installation of 03 nos. DTH Tube-wells bore at Block-P SGM Nagar in Ward 19 (New Ward), Faridabad. Recall
2025_HRY_469863_1
2025F4EB60E1 BEE5 45CB 8E80 067C25F702EC284ULB
Open Tender
Civil Works
Works
90 days
Faridabad (MC)
2 documents required · 2 mandatory
₹1,000
₹38,820
Yes
12 Nov 2025
4 Sept 2025
12 Sept 2025
4 Sept 2025
11 Sept 2025
4 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .