Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
28 Aug 2026, 10:00 am5d left
Executive Engineer
HPPWD Divsion Nadaun
C/O Building Portion i/c Water supply and sanitary Installation, Septic Tank, Rain water Harvesting Tank, Site Development etc.)
2026_PWD_141766_1
NIT No. 6808-57 dated 17-08-2026
Open Tender
Civil Works - Others
Percentage
270 days
Nadaun
Please refer Tender documents.
17 documents required · 17 mandatory
₹5,000
₹2.6 L
22 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
28 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal and transportation of surplus excavated soil / unuseful material for disposing at dumping site( to be arranged by the contractor) within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Cubic meter | 1 | ₹1 |
| 2 | Earth work in excavation for all type of road structure such as retaining walls ,breast walls, culverts, drains and parapets etcetera in all type of classification of soil comprising of ordinary soil . ordinary rock, hard rock, chiseling/ wedging out of rock (where blasting is prohibited ) as per drawings and M.O.R.D technical specification clause 305-1 and as per direction of the Engineer-in- Charge including setting out, construction of shoring and bracing removal of stumps and other deleterious materials and disposal of materials upto any leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable approved material to the original surface in layers not exceeding 150mm(one hundred fifty millimetre) compacted thickness including shoring and strutting and pumping and bailing out water ( surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per the direction of the Engineer-in- Charge including carriage of materials within all leads and lifts and other incidentals . The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Cubic meter | 0.6 | - |
| 3 | Filling with available excavted earth (exculding rock) in trenches, plinth, sides of foundation etctra in layer not exceding 20 cm (twenty centimeter) in depth consolidating each deposited layer by the ramming and watering complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | - | Per Cubic meter | 1 | - |
| 4 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Cubic meter | 1 | ₹1 |
| 5Providing and laying in position Cement concrete grade 1:3:6 (one cement : Three coarse sand : Six graded stone aggregate) 40mm ( forty millimetre) nominal size. of specified grade excluding the cost of centering and shuttering upto plinth level complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | |||||
| 6 | Providing and laying in position cement concrete of specified grade 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level excluding the cost of centering and shuttering including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 1 | Per Cubic meter | - | - |
| 7Providing and laying in position Cement concrete grade 1:2:4 (one cement : two coarse sand : four graded stone aggregate 20 mm ( twenty millimetre) nominal size of specified grade excluding the cost of centering and shuttering upto plinth level complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. TThe rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | |||||
| 8 | Providing and laying in position cement concrete of specified grade 1:5:10 (one cement : five coarse sand : ten graded stone aggregate) 40mm ( forty millimetre) nominal size. excluding the cost of centering and shuttering all work upto plinth level complete including entire carriage of materials with in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | 0.4 | Per Cubic meter | - | - |
| 9Providing and laying damp-proof course 40mm (Forty millimetre) thick with cement concrete 1:2:4 (One cement : Two coarse sand) : Four graded stone aggregate 20mm (twenty millimetre) nominal size complete including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | |||||
| 10Providing and applying a coat of residual petroleum bitumen of grade of VG-10(ten) of approved quality using 1.7 kg ( one point seven kilogram ) per square metre on damp proof course after cleaning the surface with brushes and finally with a piece of cloth lightly soaked in kerosene oil including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive octroi, royality, Malkana, toll tax, or other taxes, but excluding GST imposed by Government. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tendernotice_2.pdf
PDF • 0.48 MB
SBD.pdf
Tender Documents • 5.35 MB
BOQ_210439.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].